Files
oikos/plans/index.md
dtoro 7660e5681c complete consolidation plan — scripts, watchdog, rollback runbook
Plan #1 at 98% (code complete). Three fixes applied to remaining cutover items:

1. watchdog.sh — dual-path health checking (LAN 192.168.8.175 + mesh/Caddy
   proxy). Only pages when BOTH paths fail. Partial failure logged but not
   paged (distinguishes stack problem from mesh/Caddy issue).

2. deploy.sh — pre-deploy pg_dump before each deploy saves to
   /opt/oikos/backups/pre-deploy-<sha>.sql. Rollback script now has a
   guaranteed recovery point.

3. docs/operations/rollback.md — runbook documenting automated rollback,
   manual recovery, decision tree, backup schedule, and rehearsal log.

Two operational items remain (require operator on Proxmox/Gitea):
- Remove Gitea webhooks ids 10, 11 from dtoro/Homelab-Docs
- Archive apps/105 LXC (pct stop 105 + archive)

All active config (seeds, compose, scripts) is already clean of apps/105 refs.
Infisical bootstrap code is complete (bootstrap-infisical.sh + Go backend).
2026-07-08 11:25:43 +02:00

38 lines
2.1 KiB
Markdown

# Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
[`done/`](done/) and add changelog entries on affected node pages. If things
went sideways, open an investigation.
## Active
| Date | Title | Status |
| ---- | ----- | ------ |
| 2026-07-05 | [Oikos Prometheus LXC](2026-07-05-oikos-prometheus-lxc.md) | Planned |
| 2026-07-08 | [Plan vs implementation cross-reference](2026-07-08-plan-implementation-audit.md) | Planned |
## Done
See [`done/`](done/) for executed plans:
| Date | Title |
| ---- | ----- |
| 2026-06-01 | [Slate AX → SODOLA managed switch migration](done/2026-06-01-slate-ax-to-sodola-migration.md) |
| 2026-06-04 | [Deprecate claudio-bot](done/2026-06-04_130000-deprecate-claudio-bot.md) |
| 2026-06-25 | [Yuvomi deployment — house.hubris.network](done/2026-06-25-yuvomi-deployment.md) |
| 2026-06-29 | [Grimmory migration — Booklore → dedicated LXC](done/2026-06-29-grimmory-migration.md) |
| 2026-06-24 | [TRMNL plugins LXC (128) + middleware deploy pipeline](done/2026-06-24-trmnl-plugins-lxc.md) |
| 2026-07-06 | [Adopt wiki-hq doc architecture](done/2026-07-06-adopt-wiki-hq-doc-architecture.md) |
| 2026-07-07 | [MCP tool completion — Hermes operator interface](2026-07-07-migrate-bin-homelab-to-go.md) |
| 2026-07-07 | [DB as single source of truth for agent knowledge](2026-07-07-db-as-source-of-truth.md) |
| 2026-07-07 | [Comprehensive audit: stale files, state gaps, and next steps](2026-07-07-comprehensive-audit-and-next-steps.md) |
| 2026-07-07 | [Client lifecycle in Go — enrollment through deprecation](2026-07-07-client-lifecycle-in-go.md) |
| 2026-07-06 | [Consolidate Oikos control plane onto mac-mini](2026-07-06-consolidate-oikos-control-plane-onto-mac-mini.md) |
## Conventions
- File name: `YYYY-MM-DD-<slug>.md`. Use the *target* date if known, otherwise the planning date.
- Status: `Planned``In Progress``Done` (move to `done/` on completion).
- When done: add a changelog entry on every affected node page, then move the file to `done/`.
- Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.