Plan #1 at 98% (code complete). Three fixes applied to remaining cutover items: 1. watchdog.sh — dual-path health checking (LAN 192.168.8.175 + mesh/Caddy proxy). Only pages when BOTH paths fail. Partial failure logged but not paged (distinguishes stack problem from mesh/Caddy issue). 2. deploy.sh — pre-deploy pg_dump before each deploy saves to /opt/oikos/backups/pre-deploy-<sha>.sql. Rollback script now has a guaranteed recovery point. 3. docs/operations/rollback.md — runbook documenting automated rollback, manual recovery, decision tree, backup schedule, and rehearsal log. Two operational items remain (require operator on Proxmox/Gitea): - Remove Gitea webhooks ids 10, 11 from dtoro/Homelab-Docs - Archive apps/105 LXC (pct stop 105 + archive) All active config (seeds, compose, scripts) is already clean of apps/105 refs. Infisical bootstrap code is complete (bootstrap-infisical.sh + Go backend).
2.1 KiB
2.1 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned |
| 2026-07-08 | Plan vs implementation cross-reference | Planned |
Done
See done/ for executed plans:
| Date | Title |
|---|---|
| 2026-06-01 | Slate AX → SODOLA managed switch migration |
| 2026-06-04 | Deprecate claudio-bot |
| 2026-06-25 | Yuvomi deployment — house.hubris.network |
| 2026-06-29 | Grimmory migration — Booklore → dedicated LXC |
| 2026-06-24 | TRMNL plugins LXC (128) + middleware deploy pipeline |
| 2026-07-06 | Adopt wiki-hq doc architecture |
| 2026-07-07 | MCP tool completion — Hermes operator interface |
| 2026-07-07 | DB as single source of truth for agent knowledge |
| 2026-07-07 | Comprehensive audit: stale files, state gaps, and next steps |
| 2026-07-07 | Client lifecycle in Go — enrollment through deprecation |
| 2026-07-06 | Consolidate Oikos control plane onto mac-mini |
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.