Full review (plans/2026-07-17-codebase-review-and-cleanup.md) covering Go, web SPA, and docs. Applied low-risk doc/tooling fixes; code refactors and dead-code deletions are listed as actionable recommendations pending approval. Doc fixes: - AGENTS.md: remove ghost of retired request_execution (contradicted the retire notice above it); fix knowledge/wiki/ -> archive/knowledge/; replace brittle counts (33 tools, 36 docs, 20 checks) with pointers to source; drop point-in-time dates. - OIKOS.md: fix broken plan link (now in done/); 001-011 -> 001-020; 15 MCP tools -> pointer; replace hardcoded knowledge counts. - README.md: 15 tools -> pointer; fix wails plan link (now in done/); complete internal/ package list (add checkdefaults, observability, safego); add cmd/desktop/ to repo layout. - commands.md, page-templates.md: fix broken links; HERMES.md -> NOMOS.md. Plans housekeeping: - Move 4 done 2026-07-14 plans from plans/ to plans/done/. - Reconcile plans/index.md: add the 2 missing 2026-07-14 entries and the 2 missing 2026-07-15 done entries; add this review. - Fix stale plan path in migrations/020 comment. New docs: - docs/index.md and docs/operations/README.md (folder READMEs per writing-style.md). Tooling: - web/package.json: add check/typecheck/lint scripts + svelte-check devDep. - Makefile: desktop-package version now reads from VERSION file instead of hardcoded 0.1.0. VERSION 0.7.6 -> 0.7.7 (patch: docs + tooling only).
5.3 KiB
5.3 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned — not started |
| 2026-07-08 | Oikos gaps, broken things, and improvements | In Progress — security items (B1-B5) and doc drift (E) still open |
| 2026-07-08 | Control room web UI | In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open |
| 2026-07-08 | Liveness, drift, and UX cohesion | In Progress — Phase 5 deferred |
| 2026-07-10 | General gated execution: unlimited actions, gated by risk | In Progress — request_execution enum retired (60effcb); only auto-act revival (item 10) still open |
| 2026-07-11 | Nomos agent code review: gaps and improvement plan | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred |
| 2026-07-14 | Activity gaps | In Progress |
| 2026-07-14 | Activity timeline | In Progress |
| 2026-07-17 | Codebase review, lint audit, and documentation maintenance | Report delivered — doc/tooling fixes applied; code refactors pending |
Done
See done/ for executed plans:
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.