The agent could run two turns for one session at once (a reconnect resumed
while the live turn was still going), and their interleaved tool calls
corrupted the activity panel, fabricated a confusing "parallel/nested"
sequence, and made tasks feel stuck/never-ending. Several UX gaps compounded it.
Turn serialization (F1):
- turnGate: at most one in-flight turn per session. Background resume paths
(continuation worker, idle sweep, answer-question, /resume, reconnect)
skip non-blocking when busy; the live chat path waits briefly then bails
cleanly instead of stacking a second turn.
- resumeSession returns whether it ran; continueSession marks an execution
"continued" only after a real run (review P0) so a busy-skip can't lose a
finished-execution result. Idle nudge bumps only after delivery (P1).
Connection state (F2/F3, web):
- humanize/bucket raw errors ("model connection dropped..."); one surface
per drop; a terminal task.status event clears stuck streaming/disconnected
state and dismisses the connection toast. Reconnect no longer spawns turns.
Streaming where you look (F4, web):
- live command output in the global activity timeline and in the inline
tool card (auto-opened, tail-pinned) -- not just the per-window rail.
Other (web): artifact/knowledge deep links (F5); step-first stable
"thinking" headline (F6); stable chat layout, no empty->content reflow (F7);
lazy event sync (P2.2); reconnect skips a terminal session (P2.1).
VERSION: 0.14.2 -> 0.15.0
6.3 KiB
6.3 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned — not started |
| 2026-07-08 | Oikos gaps, broken things, and improvements | In Progress — security items (B1-B5) and doc drift (E) still open |
| 2026-07-08 | Control room web UI | In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open |
| 2026-07-08 | Liveness, drift, and UX cohesion | In Progress — Phase 5 deferred |
| 2026-07-10 | General gated execution: unlimited actions, gated by risk | In Progress — request_execution enum retired (60effcb); only auto-act revival (item 10) still open |
| 2026-07-11 | Nomos agent code review: gaps and improvement plan | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred |
| 2026-07-14 | Activity gaps | In Progress |
| 2026-07-14 | Activity timeline | In Progress |
| 2026-07-17 | Codebase review, lint audit, and documentation maintenance | Report delivered — doc/tooling fixes applied; code refactors pending |
| 2026-07-18 | Session review: three recent sessions | Implemented in v0.7.12 — P0.1/P0.2/P1.3/P1.4/P1.5/P1.6/P1.8/P2.10; P1.7 and P2.9 deferred (retry cap covers) |
| 2026-07-20 | Desktop mascot ("Cluck") | Implemented in v0.8.0 — see deviation note; physics/window-interaction follow-ups tracked separately |
| 2026-07-20 | Session review: past 10 sessions | Implemented in v0.7.13 — all P0/P1/P2 items landed |
| 2026-07-20 | Mascot physics/window-interaction audit | P0–P2 implemented; P3 ("cool stuff") ideas open |
| 2026-07-21 | Frontend as OS + Apps — architecture audit & refactor | Planned — Phase 1 ready |
| 2026-08-03 | Nomos chat: reliability & predictability audit | In Progress — F1–F7 shipped in v0.15.0; F8 + follow-ups open |
Done
See done/ for executed plans:
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.