Files
oikos/plans/index.md
dtoro 39e9227fdb
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
ci / web (push) Has been cancelled
Desktop App / Build Linux (amd64) (push) Has been cancelled
Desktop App / Attach to Release (push) Has been cancelled
feat(nomos): per-session turn serialization + chat reliability/UX fixes
The agent could run two turns for one session at once (a reconnect resumed
while the live turn was still going), and their interleaved tool calls
corrupted the activity panel, fabricated a confusing "parallel/nested"
sequence, and made tasks feel stuck/never-ending. Several UX gaps compounded it.

Turn serialization (F1):
- turnGate: at most one in-flight turn per session. Background resume paths
  (continuation worker, idle sweep, answer-question, /resume, reconnect)
  skip non-blocking when busy; the live chat path waits briefly then bails
  cleanly instead of stacking a second turn.
- resumeSession returns whether it ran; continueSession marks an execution
  "continued" only after a real run (review P0) so a busy-skip can't lose a
  finished-execution result. Idle nudge bumps only after delivery (P1).

Connection state (F2/F3, web):
- humanize/bucket raw errors ("model connection dropped..."); one surface
  per drop; a terminal task.status event clears stuck streaming/disconnected
  state and dismisses the connection toast. Reconnect no longer spawns turns.

Streaming where you look (F4, web):
- live command output in the global activity timeline and in the inline
  tool card (auto-opened, tail-pinned) -- not just the per-window rail.

Other (web): artifact/knowledge deep links (F5); step-first stable
"thinking" headline (F6); stable chat layout, no empty->content reflow (F7);
lazy event sync (P2.2); reconnect skips a terminal session (P2.1).

VERSION: 0.14.2 -> 0.15.0
2026-08-03 15:42:10 +02:00

6.3 KiB
Raw Blame History

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned — not started
2026-07-08 Oikos gaps, broken things, and improvements In Progress — security items (B1-B5) and doc drift (E) still open
2026-07-08 Control room web UI In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open
2026-07-08 Liveness, drift, and UX cohesion In Progress — Phase 5 deferred
2026-07-10 General gated execution: unlimited actions, gated by risk In Progress — request_execution enum retired (60effcb); only auto-act revival (item 10) still open
2026-07-11 Nomos agent code review: gaps and improvement plan In Progress — only C1 (unauthenticated nomos gateway) still open, deferred
2026-07-14 Activity gaps In Progress
2026-07-14 Activity timeline In Progress
2026-07-17 Codebase review, lint audit, and documentation maintenance Report delivered — doc/tooling fixes applied; code refactors pending
2026-07-18 Session review: three recent sessions Implemented in v0.7.12 — P0.1/P0.2/P1.3/P1.4/P1.5/P1.6/P1.8/P2.10; P1.7 and P2.9 deferred (retry cap covers)
2026-07-20 Desktop mascot ("Cluck") Implemented in v0.8.0 — see deviation note; physics/window-interaction follow-ups tracked separately
2026-07-20 Session review: past 10 sessions Implemented in v0.7.13 — all P0/P1/P2 items landed
2026-07-20 Mascot physics/window-interaction audit P0P2 implemented; P3 ("cool stuff") ideas open
2026-07-21 Frontend as OS + Apps — architecture audit & refactor Planned — Phase 1 ready
2026-08-03 Nomos chat: reliability & predictability audit In Progress — F1F7 shipped in v0.15.0; F8 + follow-ups open

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-08 Fix MCP analysis tools
2026-07-06 Consolidate Oikos control plane onto mac-mini
2026-07-08 Signal triggers: host health checks
2026-07-08 Plan vs implementation cross-reference
2026-07-08 Nomos resident agent (renames Hermes)
2026-07-09 Chat sessions: reliability, cost, and session-management fixes
2026-07-09 Session execution, UX, and learning improvements
2026-07-10 Autonomous plan execution: close the observation gap
2026-07-11 Tasks: the chat page as goal-structured autonomous work
2026-07-11 Concurrent task execution: safety + throughput + frontend correctness
2026-07-11 UI review: information architecture, usability, and best practices
2026-07-11 Task completion safety net: every live task is stuck "Running"
2026-07-12 Wails desktop application
2026-07-13 MCP tool apps: custom in-chat renderers
2026-07-14 Session reliability & UX audit
2026-07-14 Tool timeline in sidebar
2026-07-14 Unified agent activity indicator
2026-07-14 Post-fix session remainders: empty responses & plan drift
2026-07-15 Plan-first and iteration
2026-07-15 WhatsApp session audit

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.