Files
oikos/plans/index.md
dtoro 9f40f19f25
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
Desktop App / Build Linux (amd64) (push) Has been cancelled
Desktop App / Attach to Release (push) Has been cancelled
unified agent indicator at end of conversation
- New AgentIndicator component: replaces 3 separate indicators
  (loading dots, ToolCallGroup summary, activity bar) with one
- Positioned as last item in message list — scrolls naturally
- Shows current tool action: 'Researching lxc:nfs-export…' etc
- Spinner during work, check on completion, X on error
- Fades out 3s after turn completes
- Activity bar, loading dots, statusLabel removed from Chat
- Continue button moved to sidebar session panel
2026-07-14 11:59:04 +02:00

58 lines
4.7 KiB
Markdown

# Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
[`done/`](done/) and add changelog entries on affected node pages. If things
went sideways, open an investigation.
## Active
| Date | Title | Status |
| ---- | ----- | ------ |
| 2026-07-05 | [Oikos Prometheus LXC](2026-07-05-oikos-prometheus-lxc.md) | Planned — not started |
| 2026-07-08 | [Oikos gaps, broken things, and improvements](2026-07-08-oikos-gaps-and-improvements.md) | In Progress — security items (B1-B5) and doc drift (E) still open |
| 2026-07-08 | [Control room web UI](2026-07-08-control-room-webui.md) | In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open |
| 2026-07-08 | [Liveness, drift, and UX cohesion](2026-07-08-liveness-drift-and-ux-cohesion.md) | In Progress — Phase 5 deferred |
| 2026-07-10 | [General gated execution: unlimited actions, gated by risk](2026-07-10-general-gated-execution.md) | In Progress — enum retirement + auto-act revival still open |
| 2026-07-11 | [Nomos agent code review: gaps and improvement plan](2026-07-11-nomos-agent-code-review.md) | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred |
| 2026-07-14 | [Session reliability & UX audit](2026-07-14-session-reliability-and-ux-audit.md) | Done — all 21 fixes deployed |
| 2026-07-14 | [Tool timeline in sidebar](2026-07-14-tool-timeline-sidebar.md) | Done — deployed v0.3.2 |
| 2026-07-14 | [Unified agent activity indicator](2026-07-14-unified-agent-indicator.md) | Done — deployed v0.3.3 |
## Done
See [`done/`](done/) for executed plans:
| Date | Title |
| ---- | ----- |
| 2026-06-01 | [Slate AX → SODOLA managed switch migration](done/2026-06-01-slate-ax-to-sodola-migration.md) |
| 2026-06-04 | [Deprecate claudio-bot](done/2026-06-04_130000-deprecate-claudio-bot.md) |
| 2026-06-25 | [Yuvomi deployment — house.hubris.network](done/2026-06-25-yuvomi-deployment.md) |
| 2026-06-29 | [Grimmory migration — Booklore → dedicated LXC](done/2026-06-29-grimmory-migration.md) |
| 2026-06-24 | [TRMNL plugins LXC (128) + middleware deploy pipeline](done/2026-06-24-trmnl-plugins-lxc.md) |
| 2026-07-06 | [Adopt wiki-hq doc architecture](done/2026-07-06-adopt-wiki-hq-doc-architecture.md) |
| 2026-07-07 | [MCP tool completion — Hermes operator interface](done/2026-07-07-migrate-bin-homelab-to-go.md) |
| 2026-07-07 | [DB as single source of truth for agent knowledge](done/2026-07-07-db-as-source-of-truth.md) |
| 2026-07-07 | [Comprehensive audit: stale files, state gaps, and next steps](done/2026-07-07-comprehensive-audit-and-next-steps.md) |
| 2026-07-07 | [Client lifecycle in Go — enrollment through deprecation](done/2026-07-07-client-lifecycle-in-go.md) |
| 2026-07-08 | [Fix MCP analysis tools](done/2026-07-08-fix-mcp-analysis-tools.md) |
| 2026-07-06 | [Consolidate Oikos control plane onto mac-mini](done/2026-07-06-consolidate-oikos-control-plane-onto-mac-mini.md) |
| 2026-07-08 | [Signal triggers: host health checks](done/2026-07-08-signal-triggers.md) |
| 2026-07-08 | [Plan vs implementation cross-reference](done/2026-07-08-plan-implementation-audit.md) |
| 2026-07-08 | [Nomos resident agent (renames Hermes)](done/2026-07-08-nomos-resident-agent.md) |
| 2026-07-09 | [Chat sessions: reliability, cost, and session-management fixes](done/2026-07-09-chat-sessions-improvements.md) |
| 2026-07-09 | [Session execution, UX, and learning improvements](done/2026-07-09-session-execution-and-ux-fixes.md) |
| 2026-07-10 | [Autonomous plan execution: close the observation gap](done/2026-07-10-autonomous-plan-execution.md) |
| 2026-07-11 | [Tasks: the chat page as goal-structured autonomous work](done/2026-07-11-goal-oriented-chat-control-panel.md) |
| 2026-07-11 | [Concurrent task execution: safety + throughput + frontend correctness](done/2026-07-11-concurrent-task-execution.md) |
| 2026-07-11 | [UI review: information architecture, usability, and best practices](done/2026-07-11-ui-review-ia-usability.md) |
| 2026-07-11 | [Task completion safety net: every live task is stuck "Running"](done/2026-07-11-task-completion-safety-net.md) |
| 2026-07-12 | [Wails desktop application](done/2026-07-12-wails-desktop-app.md) |
| 2026-07-13 | [MCP tool apps: custom in-chat renderers](done/2026-07-13-mcp-tool-apps-custom-chat-renderers.md) |
## Conventions
- File name: `YYYY-MM-DD-<slug>.md`. Use the *target* date if known, otherwise the planning date.
- Status: `Planned``In Progress``Done` (move to `done/` on completion).
- When done: add a changelog entry on every affected node page, then move the file to `done/`.
- Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.