Evaluate the agent's action path against the OIKOS.md design. Finding: the intended model (unlimited runbook-driven actions gated by a risk classifier) already exists on paper and in scaffolding, but the live agent path regressed to a hard-coded 5-action enum that bypasses the classifier. Plan a layered realignment: (0) one general gated `run` primitive, (1) runbooks-as-data as the reliable fast-path, (2) learning. Chosen v1 posture: approve-most (read-only auto-runs, all state changes gate). Incremental, each step shippable. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
3.1 KiB
3.1 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned |
| 2026-07-08 | Plan vs implementation cross-reference | Planned |
| 2026-07-08 | Oikos gaps, broken things, and improvements | Planned |
| 2026-07-08 | Control room web UI | In Progress |
| 2026-07-08 | Nomos resident agent (renames Hermes) | In Progress |
| 2026-07-08 | Liveness, drift, and UX cohesion | In Progress |
| 2026-07-09 | Chat sessions: reliability, cost, and session-management fixes | Planned |
| 2026-07-09 | Session execution, UX, and learning improvements | Planned |
| 2026-07-10 | General gated execution: unlimited actions, gated by risk | Planned |
Done
See done/ for executed plans:
| Date | Title |
|---|---|
| 2026-06-01 | Slate AX → SODOLA managed switch migration |
| 2026-06-04 | Deprecate claudio-bot |
| 2026-06-25 | Yuvomi deployment — house.hubris.network |
| 2026-06-29 | Grimmory migration — Booklore → dedicated LXC |
| 2026-06-24 | TRMNL plugins LXC (128) + middleware deploy pipeline |
| 2026-07-06 | Adopt wiki-hq doc architecture |
| 2026-07-07 | MCP tool completion — Hermes operator interface |
| 2026-07-07 | DB as single source of truth for agent knowledge |
| 2026-07-07 | Comprehensive audit: stale files, state gaps, and next steps |
| 2026-07-07 | Client lifecycle in Go — enrollment through deprecation |
| 2026-07-08 | Fix MCP analysis tools |
| 2026-07-06 | Consolidate Oikos control plane onto mac-mini |
| 2026-07-08 | Signal triggers: host health checks |
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.