Plan #4 done. Audit inventory verified against codebase: - 9 superseded oikos/*.py files deleted (only gen-topology.py remains) - bin/homelab deleted, bin/oikos deleted, oikos/cards/ deleted - .hermes/plans/ already archived to archive/hermes-plans/ (all 7 files) - TRMNL plan already in Done table - seanime + romm documented in seeds/knowledge.yaml (DB-native, no wiki needed) - Traefik references valid (VPS still runs traefik for public termination) - ADR-0011 exists (client lifecycle); consolidation plan is Go rewrite record - Prometheus plan updated: Python refs replaced with Go scheduler, check_defs, MCP request_execution; LXC 131 identified as teddycloud Remaining items (cutover, Infisical, watchdog, rollback, apps/105) belong to consolidation plan (#1). 4 of 6 plans now Done.
2.2 KiB
2.2 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned |
| 2026-07-06 | Consolidate Oikos control plane onto mac-mini | In Progress (Phase 1-6 implemented, pending cutover) |
| 2026-07-07 | Client lifecycle in Go — enrollment through deprecation | Planned |
| 2026-07-08 | Plan vs implementation cross-reference | Planned |
Done
See done/ for executed plans:
| Date | Title |
|---|---|
| 2026-06-01 | Slate AX → SODOLA managed switch migration |
| 2026-06-04 | Deprecate claudio-bot |
| 2026-06-25 | Yuvomi deployment — house.hubris.network |
| 2026-06-29 | Grimmory migration — Booklore → dedicated LXC |
| 2026-06-24 | TRMNL plugins LXC (128) + middleware deploy pipeline |
| 2026-07-06 | Adopt wiki-hq doc architecture |
| 2026-07-07 | MCP tool completion — Hermes operator interface |
| 2026-07-07 | DB as single source of truth for agent knowledge |
| 2026-07-07 | Comprehensive audit: stale files, state gaps, and next steps |
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.