dtoro 43aaf2a318 complete comprehensive audit — all cleanup items resolved
Plan #4 done. Audit inventory verified against codebase:

- 9 superseded oikos/*.py files deleted (only gen-topology.py remains)
- bin/homelab deleted, bin/oikos deleted, oikos/cards/ deleted
- .hermes/plans/ already archived to archive/hermes-plans/ (all 7 files)
- TRMNL plan already in Done table
- seanime + romm documented in seeds/knowledge.yaml (DB-native, no wiki needed)
- Traefik references valid (VPS still runs traefik for public termination)
- ADR-0011 exists (client lifecycle); consolidation plan is Go rewrite record
- Prometheus plan updated: Python refs replaced with Go scheduler, check_defs,
  MCP request_execution; LXC 131 identified as teddycloud

Remaining items (cutover, Infisical, watchdog, rollback, apps/105) belong to
consolidation plan (#1). 4 of 6 plans now Done.
2026-07-08 11:09:37 +02:00

2.2 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned
2026-07-06 Consolidate Oikos control plane onto mac-mini In Progress (Phase 1-6 implemented, pending cutover)
2026-07-07 Client lifecycle in Go — enrollment through deprecation Planned
2026-07-08 Plan vs implementation cross-reference Planned

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.