feat(ui): M4 — agent activity, knowledge search, audit, correlation grouping
Add three new pages completing the control-room web UI:
- Agent activity: polls /agent-activity every 5s, filterable by type/agent
- Knowledge search: FTS over /knowledge/search with snippet + entity links
- Audit trail: browseable audit log with actor/action/entity filters

Enhanced live events page with correlation-id clustering (Groups toggle).
Added fetchAgentActivity/searchKnowledge/fetchAudit to the API client.
11 nav items now cover all planned control-room views.
2026-07-08 17:02:09 +02:00

2.5 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned
2026-07-08 Plan vs implementation cross-reference Planned
2026-07-08 Oikos gaps, broken things, and improvements Planned
2026-07-08 Control room web UI In Progress
2026-07-08 Nomos resident agent (renames Hermes) In Progress

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-08 Fix MCP analysis tools
2026-07-06 Consolidate Oikos control plane onto mac-mini

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.