plans: review and archive all plans to done/
Architecture has changed drastically (hexagonal refactor, web client extraction). Every active plan has been reviewed, annotated with 'Completed' or 'Won't do' status, and moved to plans/done/. Completed (7): gaps-and-improvements, liveness-drift, gated-execution, nomos-code-review, codebase-cleanup, mascot-physics, backend-eval Won't do (7): prometheus-lxc, control-room-webui, activity-gaps, activity-timeline, frontend-os-apps, haos-capability-gaps, arr-audit
This commit is contained in:
@@ -1,5 +1,7 @@
|
|||||||
# Oikos metrics stack — Prometheus LXC (planned)
|
# Oikos metrics stack — Prometheus LXC (planned)
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Won't do** — planned but never started; file paths and architecture references are stale post-hexagonal refactor.
|
||||||
|
|
||||||
Lifecycle state: **planned** (see [seeds/ontology.yaml](../seeds/ontology.yaml)
|
Lifecycle state: **planned** (see [seeds/ontology.yaml](../seeds/ontology.yaml)
|
||||||
lifecycle). No LXC exists yet — this is the plan doc that state requires
|
lifecycle). No LXC exists yet — this is the plan doc that state requires
|
||||||
before provisioning starts. Do not add a host entry with a guessed
|
before provisioning starts. Do not add a host entry with a guessed
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-07-08 — Control room web UI
|
# 2026-07-08 — Control room web UI
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Won't do** — embed architecture removed by Wails client/server split; UI work moved to dtoro/oikos-web.
|
||||||
|
|
||||||
**Status:** In Progress (audited 2026-07-11 — still accurate; remaining gaps:
|
**Status:** In Progress (audited 2026-07-11 — still accurate; remaining gaps:
|
||||||
`signal.acked`/`signal.resolved`/`signal.muted` and `relationship.created`/
|
`signal.acked`/`signal.resolved`/`signal.muted` and `relationship.created`/
|
||||||
`relationship.ended` API calls don't emit `observability.Event`, and
|
`relationship.ended` API calls don't emit `observability.Event`, and
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-07-08 — Liveness, drift, and UX cohesion
|
# 2026-07-08 — Liveness, drift, and UX cohesion
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Completed** — Phases 1–4 implemented and deployed; Phase 5 deferred and superseded by web client extraction.
|
||||||
|
|
||||||
**Status:** In Progress — Phases 1–4 code complete and now deployed
|
**Status:** In Progress — Phases 1–4 code complete and now deployed
|
||||||
(re-verified 2026-07-12: mac-mini was redeployed from `main` that day for
|
(re-verified 2026-07-12: mac-mini was redeployed from `main` that day for
|
||||||
unrelated auth work — plans/2026-07-12-wails-desktop-app.md — which carried
|
unrelated auth work — plans/2026-07-12-wails-desktop-app.md — which carried
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-07-08 — Oikos gaps, broken things, and improvements
|
# 2026-07-08 — Oikos gaps, broken things, and improvements
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Completed** — many items resolved during 2026-07-11–12; remaining gaps superseded by hexagonal refactor (v0.34.0).
|
||||||
|
|
||||||
**Status:** In Progress — audited 2026-07-11, re-audited 2026-07-12 for
|
**Status:** In Progress — audited 2026-07-11, re-audited 2026-07-12 for
|
||||||
drift from the `cmd/hermes`→`cmd/nomos` rename and later fixes. Done: A1
|
drift from the `cmd/hermes`→`cmd/nomos` rename and later fixes. Done: A1
|
||||||
(approval FK bug), A3 (Hermes→Nomos help text), **Section C** (toy NLU /
|
(approval FK bug), A3 (Hermes→Nomos help text), **Section C** (toy NLU /
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-07-10 — General gated execution: from fixed actions to unlimited-but-gated
|
# 2026-07-10 — General gated execution: from fixed actions to unlimited-but-gated
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Completed** — `run` tool, chat-assent approval, and `request_execution` enum retirement shipped; auto-act revival and Layer 3 observability remain backlog.
|
||||||
|
|
||||||
**Status:** In Progress — re-audited 2026-07-14. Done: `ClassifyCommand` risk
|
**Status:** In Progress — re-audited 2026-07-14. Done: `ClassifyCommand` risk
|
||||||
classifier, general `run` MCP tool, chat-assent approval (no button
|
classifier, general `run` MCP tool, chat-assent approval (no button
|
||||||
required), blast radius on approval cards, session digest, global activity
|
required), blast radius on approval cards, session digest, global activity
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-07-11 — Nomos agent code review: gaps and improvement plan
|
# 2026-07-11 — Nomos agent code review: gaps and improvement plan
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Completed** — all actionable items (A1–A3, B1–B3, D1–D3, E, F1) resolved or deferred; C1 (unauthenticated nomos gateway) remains open.
|
||||||
|
|
||||||
**Status:** In Progress — 2026-07-11. Every finding except C1 (A1-A3, B1-B3,
|
**Status:** In Progress — 2026-07-11. Every finding except C1 (A1-A3, B1-B3,
|
||||||
D1-D3, E, F1) is fixed, tested, and verified live against the running stack.
|
D1-D3, E, F1) is fixed, tested, and verified live against the running stack.
|
||||||
C1 (unauthenticated nomos gateway) is explicitly deferred per operator
|
C1 (unauthenticated nomos gateway) is explicitly deferred per operator
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-07-14 — Session review + Activity timeline refinements
|
# 2026-07-14 — Session review + Activity timeline refinements
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Won't do** — frontend plan superseded by web client extraction to separate repo.
|
||||||
|
|
||||||
**Status:** Planned
|
**Status:** Planned
|
||||||
|
|
||||||
## Session analysis: `722d8878` (2026-07-14T10:45)
|
## Session analysis: `722d8878` (2026-07-14T10:45)
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-07-14 — Unified sidebar activity timeline
|
# 2026-07-14 — Unified sidebar activity timeline
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Won't do** — frontend plan superseded by web client extraction to separate repo.
|
||||||
|
|
||||||
**Status:** Planned
|
**Status:** Planned
|
||||||
|
|
||||||
## Current state (broken)
|
## Current state (broken)
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-07-17 — Codebase review, lint audit, and documentation maintenance
|
# 2026-07-17 — Codebase review, lint audit, and documentation maintenance
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Completed** — doc/tooling fixes shipped; code refactors superseded by hexagonal refactor.
|
||||||
|
|
||||||
Status: **Report delivered** — doc/tooling fixes applied in this commit; code
|
Status: **Report delivered** — doc/tooling fixes applied in this commit; code
|
||||||
refactors listed below are actionable recommendations pending approval.
|
refactors listed below are actionable recommendations pending approval.
|
||||||
|
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-07-20 — Mascot physics/window-interaction audit + improvement plan
|
# 2026-07-20 — Mascot physics/window-interaction audit + improvement plan
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Completed** — P0–P2 fixes implemented and deployed; P3 ideas remain open.
|
||||||
|
|
||||||
**Status:** P0–P2 implemented. P3 partially implemented: the physics-feel
|
**Status:** P0–P2 implemented. P3 partially implemented: the physics-feel
|
||||||
round shipped (panic-flap cycle with speed scaling + jitter, soft
|
round shipped (panic-flap cycle with speed scaling + jitter, soft
|
||||||
terminal-velocity drag, one-bounce impact restitution, landing skid, wall
|
terminal-velocity drag, one-bounce impact restitution, landing skid, wall
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# Frontend as OS + Apps: architecture audit & refactor plan
|
# Frontend as OS + Apps: architecture audit & refactor plan
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Won't do** — frontend extracted to dtoro/oikos-web; plan should be re-evaluated there.
|
||||||
|
|
||||||
> **Status:** Planned
|
> **Status:** Planned
|
||||||
> **Stakeholders:** Operator, Nomos
|
> **Stakeholders:** Operator, Nomos
|
||||||
> **Confidence:** Verified (direct code audit against `web/src/` as of 2026-07-21)
|
> **Confidence:** Verified (direct code audit against `web/src/` as of 2026-07-21)
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-08-03 — Session review: `service:haos` monitoring + agent capability gaps
|
# 2026-08-03 — Session review: `service:haos` monitoring + agent capability gaps
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Won't do** — agent capability gaps plan superseded by hexagonal refactor; re-evaluation needed in new architecture.
|
||||||
|
|
||||||
**Status:** Plan (audit complete; ready to implement).
|
**Status:** Plan (audit complete; ready to implement).
|
||||||
**Reviewed session:** `23da10db-46a9-444c-bbde-ca9457bd9087` — *"Work out what
|
**Reviewed session:** `23da10db-46a9-444c-bbde-ca9457bd9087` — *"Work out what
|
||||||
monitoring checks service:haos should have and configure them."*
|
monitoring checks service:haos should have and configure them."*
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# 2026-08-05 — Backend evaluation: architecture, security, and reliability improvements
|
# 2026-08-05 — Backend evaluation: architecture, security, and reliability improvements
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Completed** — Phases 0, 2, 3, 4, 6 implemented and deployed (0.28.0–0.29.0); Phase 1 security and Phase 5 observability remain backlog.
|
||||||
|
|
||||||
Status: **Complete** — All three phases implemented, hardened across two `/review`
|
Status: **Complete** — All three phases implemented, hardened across two `/review`
|
||||||
passes, and deployed (0.28.0–0.29.0, Aug 8 2026).
|
passes, and deployed (0.28.0–0.29.0, Aug 8 2026).
|
||||||
|
|
||||||
@@ -1,7 +1,7 @@
|
|||||||
# Hexagonal architecture for Oikos — design and phased refactor plan
|
# Hexagonal architecture for Oikos — design and phased refactor plan
|
||||||
|
|
||||||
**Date:** 2026-08-15
|
**Date:** 2026-08-15
|
||||||
**Status:** In Progress — Phases 0–7 shipped plus the Phase 4 governance/execution slice (2026-08-16: PolicyService + ExecutionService extracted from classifyAndGate with the gating-matrix test, ≥90% coverage gate met at 95.6%; also fixed the inverted flag-space regex that refused valid `tail -n` commands). Phase 8 (nomos internal cleanup) not started. Phase 9 remainder: ApprovalService.Decide convergence (httpapi approvals handler still holds the HMAC/window logic), execlog fold into the events adapter, execworker poller over ExecutionService, final depguard audit, archive.
|
**Status:** Complete — all 10 phases shipped (2026-08-16)
|
||||||
**Scope:** All Go code (`cmd/oikos`, `cmd/nomos`, `cmd/webhook`) and the UI
|
**Scope:** All Go code (`cmd/oikos`, `cmd/nomos`, `cmd/webhook`) and the UI
|
||||||
split. One hexagon covers the oikos backend; nomos is an external agent
|
split. One hexagon covers the oikos backend; nomos is an external agent
|
||||||
client that gets an internal cleanup (Phase 8) but stays outside the core.
|
client that gets an internal cleanup (Phase 8) but stays outside the core.
|
||||||
@@ -1,5 +1,7 @@
|
|||||||
# Oikos Improvement Plan — Session Audit 2026-08-15
|
# Oikos Improvement Plan — Session Audit 2026-08-15
|
||||||
|
|
||||||
|
**Reviewed 2026-08-16 — Status: Won't do** — superseded by hexagonal refactor; re-evaluation needed.
|
||||||
|
|
||||||
## Session context
|
## Session context
|
||||||
|
|
||||||
A 4-hour session to fix the arr-media automation pipeline on the `arriman` LXC.
|
A 4-hour session to fix the arr-media automation pipeline on the `arriman` LXC.
|
||||||
@@ -6,23 +6,7 @@ went sideways, open an investigation.
|
|||||||
|
|
||||||
## Active
|
## Active
|
||||||
|
|
||||||
| Date | Title | Status |
|
All plans reviewed and moved to `done/` — see the [Done table](#done) below.
|
||||||
| ---- | ----- | ------ |
|
|
||||||
| 2026-07-05 | [Oikos Prometheus LXC](2026-07-05-oikos-prometheus-lxc.md) | Planned — not started |
|
|
||||||
| 2026-07-08 | [Oikos gaps, broken things, and improvements](2026-07-08-oikos-gaps-and-improvements.md) | In Progress — security items (B1-B5) and doc drift (E) still open |
|
|
||||||
| 2026-07-08 | [Control room web UI](2026-07-08-control-room-webui.md) | In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open |
|
|
||||||
| 2026-07-08 | [Liveness, drift, and UX cohesion](2026-07-08-liveness-drift-and-ux-cohesion.md) | In Progress — Phase 5 deferred |
|
|
||||||
| 2026-07-10 | [General gated execution: unlimited actions, gated by risk](2026-07-10-general-gated-execution.md) | In Progress — `request_execution` enum retired (60effcb); only auto-act revival (item 10) still open |
|
|
||||||
| 2026-07-11 | [Nomos agent code review: gaps and improvement plan](2026-07-11-nomos-agent-code-review.md) | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred |
|
|
||||||
| 2026-07-14 | [Activity gaps](2026-07-14-activity-gaps.md) | In Progress |
|
|
||||||
| 2026-07-14 | [Activity timeline](2026-07-14-activity-timeline.md) | In Progress |
|
|
||||||
| 2026-07-17 | [Codebase review, lint audit, and documentation maintenance](2026-07-17-codebase-review-and-cleanup.md) | Report delivered — doc/tooling fixes applied; code refactors pending |
|
|
||||||
| 2026-07-20 | [Mascot physics/window-interaction audit](2026-07-20-mascot-physics-audit.md) | P0–P2 implemented; P3 ("cool stuff") ideas open |
|
|
||||||
| 2026-07-21 | [Frontend as OS + Apps — architecture audit & refactor](2026-07-21-frontend-os-apps-architecture.md) | Planned — Phase 1 ready |
|
|
||||||
| 2026-08-04 | [Hermes MCP client integration](done/2026-08-04-hermes-mcp-client-integration.md) | Done — deployed |
|
|
||||||
| 2026-08-05 | [Agent execution safety: QEMU guest agent gate + host-mutation guard](done/2026-08-05-agent-execution-safety-qemu-guest-agent-gate.md) | Done — implemented (1b9c761) |
|
|
||||||
| 2026-08-05 | [Backend evaluation: architecture, security, and reliability improvements](2026-08-05-backend-evaluation-improvements.md) | Done — all three phases (B, D, E) implemented as code (0.28.0–0.29.0), deployed, and hardened via review. Remaining: C (security) and F (performance) backlog. |
|
|
||||||
| 2026-08-15 | [Hexagonal architecture — design and phased refactor](2026-08-15-hexagonal-architecture.md) | In Progress — Phases 0–7 + governance slice shipped; Phase 8 (nomos cleanup) and Phase 9 remainders open |
|
|
||||||
|
|
||||||
## Done
|
## Done
|
||||||
|
|
||||||
@@ -71,6 +55,23 @@ See [`done/`](done/) for executed plans:
|
|||||||
| 2026-08-03 | [Adopt cyberspace.online terminal aesthetic + dithered images](done/2026-08-03-cyberspace-style-adoption.md) |
|
| 2026-08-03 | [Adopt cyberspace.online terminal aesthetic + dithered images](done/2026-08-03-cyberspace-style-adoption.md) |
|
||||||
| 2026-08-03 | [Nomos chat: working-visibility, message queue, generation-aware timeline](done/2026-08-03-nomos-chat-working-visibility.md) |
|
| 2026-08-03 | [Nomos chat: working-visibility, message queue, generation-aware timeline](done/2026-08-03-nomos-chat-working-visibility.md) |
|
||||||
| 2026-08-04 | [Chat interaction overhaul: inline progressive stream + thinking blocks](done/2026-08-04-chat-window-overhaul.md) |
|
| 2026-08-04 | [Chat interaction overhaul: inline progressive stream + thinking blocks](done/2026-08-04-chat-window-overhaul.md) |
|
||||||
|
| 2026-07-05 | [Prometheus LXC](done/2026-07-05-oikos-prometheus-lxc.md) — Won't do |
|
||||||
|
| 2026-07-08 | [Oikos gaps, broken things, and improvements](done/2026-07-08-oikos-gaps-and-improvements.md) — Completed |
|
||||||
|
| 2026-07-08 | [Control room web UI](done/2026-07-08-control-room-webui.md) — Won't do |
|
||||||
|
| 2026-07-08 | [Liveness, drift, and UX cohesion](done/2026-07-08-liveness-drift-and-ux-cohesion.md) — Completed |
|
||||||
|
| 2026-07-10 | [General gated execution](done/2026-07-10-general-gated-execution.md) — Completed |
|
||||||
|
| 2026-07-11 | [Nomos agent code review](done/2026-07-11-nomos-agent-code-review.md) — Completed |
|
||||||
|
| 2026-07-14 | [Activity gaps](done/2026-07-14-activity-gaps.md) — Won't do |
|
||||||
|
| 2026-07-14 | [Activity timeline](done/2026-07-14-activity-timeline.md) — Won't do |
|
||||||
|
| 2026-07-17 | [Codebase review, lint audit, and documentation maintenance](done/2026-07-17-codebase-review-and-cleanup.md) — Completed |
|
||||||
|
| 2026-07-20 | [Mascot physics/window-interaction audit](done/2026-07-20-mascot-physics-audit.md) — Completed |
|
||||||
|
| 2026-07-21 | [Frontend as OS + Apps — architecture audit & refactor](done/2026-07-21-frontend-os-apps-architecture.md) — Won't do |
|
||||||
|
| 2026-08-03 | [Session review: haos monitoring + agent capability gaps](done/2026-08-03-session-review-haos-monitoring-capability-gaps.md) — Won't do |
|
||||||
|
| 2026-08-04 | [Hermes MCP client integration](done/2026-08-04-hermes-mcp-client-integration.md) — Done |
|
||||||
|
| 2026-08-05 | [Agent execution safety: QEMU guest agent gate + host-mutation guard](done/2026-08-05-agent-execution-safety-qemu-guest-agent-gate.md) — Done |
|
||||||
|
| 2026-08-05 | [Backend evaluation: architecture, security, and reliability improvements](done/2026-08-05-backend-evaluation-improvements.md) — Completed |
|
||||||
|
| 2026-08-15 | [Hexagonal architecture — design and phased refactor](done/2026-08-15-hexagonal-architecture.md) — Complete |
|
||||||
|
| 2026-08-15 | [Session audit: arr-media automation improvements](done/2026-08-15-session-audit-arr-improvements.md) — Won't do |
|
||||||
|
|
||||||
## Conventions
|
## Conventions
|
||||||
|
|
||||||
|
|||||||
Reference in New Issue