diff --git a/plans/2026-07-05-oikos-prometheus-lxc.md b/plans/done/2026-07-05-oikos-prometheus-lxc.md similarity index 95% rename from plans/2026-07-05-oikos-prometheus-lxc.md rename to plans/done/2026-07-05-oikos-prometheus-lxc.md index 23bc84f9..c8fe5673 100644 --- a/plans/2026-07-05-oikos-prometheus-lxc.md +++ b/plans/done/2026-07-05-oikos-prometheus-lxc.md @@ -1,5 +1,7 @@ # Oikos metrics stack — Prometheus LXC (planned) +**Reviewed 2026-08-16 — Status: Won't do** — planned but never started; file paths and architecture references are stale post-hexagonal refactor. + Lifecycle state: **planned** (see [seeds/ontology.yaml](../seeds/ontology.yaml) lifecycle). No LXC exists yet — this is the plan doc that state requires before provisioning starts. Do not add a host entry with a guessed diff --git a/plans/2026-07-08-control-room-webui.md b/plans/done/2026-07-08-control-room-webui.md similarity index 98% rename from plans/2026-07-08-control-room-webui.md rename to plans/done/2026-07-08-control-room-webui.md index 7e0dc6a4..c9be64a0 100644 --- a/plans/2026-07-08-control-room-webui.md +++ b/plans/done/2026-07-08-control-room-webui.md @@ -1,5 +1,7 @@ # 2026-07-08 — Control room web UI +**Reviewed 2026-08-16 — Status: Won't do** — embed architecture removed by Wails client/server split; UI work moved to dtoro/oikos-web. + **Status:** In Progress (audited 2026-07-11 — still accurate; remaining gaps: `signal.acked`/`signal.resolved`/`signal.muted` and `relationship.created`/ `relationship.ended` API calls don't emit `observability.Event`, and diff --git a/plans/2026-07-08-liveness-drift-and-ux-cohesion.md b/plans/done/2026-07-08-liveness-drift-and-ux-cohesion.md similarity index 98% rename from plans/2026-07-08-liveness-drift-and-ux-cohesion.md rename to plans/done/2026-07-08-liveness-drift-and-ux-cohesion.md index 7f511ec7..732545c8 100644 --- a/plans/2026-07-08-liveness-drift-and-ux-cohesion.md +++ b/plans/done/2026-07-08-liveness-drift-and-ux-cohesion.md @@ -1,5 +1,7 @@ # 2026-07-08 — Liveness, drift, and UX cohesion +**Reviewed 2026-08-16 — Status: Completed** — Phases 1–4 implemented and deployed; Phase 5 deferred and superseded by web client extraction. + **Status:** In Progress — Phases 1–4 code complete and now deployed (re-verified 2026-07-12: mac-mini was redeployed from `main` that day for unrelated auth work — plans/2026-07-12-wails-desktop-app.md — which carried diff --git a/plans/2026-07-08-oikos-gaps-and-improvements.md b/plans/done/2026-07-08-oikos-gaps-and-improvements.md similarity index 98% rename from plans/2026-07-08-oikos-gaps-and-improvements.md rename to plans/done/2026-07-08-oikos-gaps-and-improvements.md index 33d37060..513b332f 100644 --- a/plans/2026-07-08-oikos-gaps-and-improvements.md +++ b/plans/done/2026-07-08-oikos-gaps-and-improvements.md @@ -1,5 +1,7 @@ # 2026-07-08 — Oikos gaps, broken things, and improvements +**Reviewed 2026-08-16 — Status: Completed** — many items resolved during 2026-07-11–12; remaining gaps superseded by hexagonal refactor (v0.34.0). + **Status:** In Progress — audited 2026-07-11, re-audited 2026-07-12 for drift from the `cmd/hermes`→`cmd/nomos` rename and later fixes. Done: A1 (approval FK bug), A3 (Hermes→Nomos help text), **Section C** (toy NLU / diff --git a/plans/2026-07-10-general-gated-execution.md b/plans/done/2026-07-10-general-gated-execution.md similarity index 98% rename from plans/2026-07-10-general-gated-execution.md rename to plans/done/2026-07-10-general-gated-execution.md index 881a8375..24c75422 100644 --- a/plans/2026-07-10-general-gated-execution.md +++ b/plans/done/2026-07-10-general-gated-execution.md @@ -1,5 +1,7 @@ # 2026-07-10 — General gated execution: from fixed actions to unlimited-but-gated +**Reviewed 2026-08-16 — Status: Completed** — `run` tool, chat-assent approval, and `request_execution` enum retirement shipped; auto-act revival and Layer 3 observability remain backlog. + **Status:** In Progress — re-audited 2026-07-14. Done: `ClassifyCommand` risk classifier, general `run` MCP tool, chat-assent approval (no button required), blast radius on approval cards, session digest, global activity diff --git a/plans/2026-07-11-nomos-agent-code-review.md b/plans/done/2026-07-11-nomos-agent-code-review.md similarity index 99% rename from plans/2026-07-11-nomos-agent-code-review.md rename to plans/done/2026-07-11-nomos-agent-code-review.md index 3d1c45b6..7d54da2b 100644 --- a/plans/2026-07-11-nomos-agent-code-review.md +++ b/plans/done/2026-07-11-nomos-agent-code-review.md @@ -1,5 +1,7 @@ # 2026-07-11 — Nomos agent code review: gaps and improvement plan +**Reviewed 2026-08-16 — Status: Completed** — all actionable items (A1–A3, B1–B3, D1–D3, E, F1) resolved or deferred; C1 (unauthenticated nomos gateway) remains open. + **Status:** In Progress — 2026-07-11. Every finding except C1 (A1-A3, B1-B3, D1-D3, E, F1) is fixed, tested, and verified live against the running stack. C1 (unauthenticated nomos gateway) is explicitly deferred per operator diff --git a/plans/2026-07-14-activity-gaps.md b/plans/done/2026-07-14-activity-gaps.md similarity index 98% rename from plans/2026-07-14-activity-gaps.md rename to plans/done/2026-07-14-activity-gaps.md index 83fe9443..35b312b9 100644 --- a/plans/2026-07-14-activity-gaps.md +++ b/plans/done/2026-07-14-activity-gaps.md @@ -1,5 +1,7 @@ # 2026-07-14 — Session review + Activity timeline refinements +**Reviewed 2026-08-16 — Status: Won't do** — frontend plan superseded by web client extraction to separate repo. + **Status:** Planned ## Session analysis: `722d8878` (2026-07-14T10:45) diff --git a/plans/2026-07-14-activity-timeline.md b/plans/done/2026-07-14-activity-timeline.md similarity index 97% rename from plans/2026-07-14-activity-timeline.md rename to plans/done/2026-07-14-activity-timeline.md index 48734bbb..cb11b0c2 100644 --- a/plans/2026-07-14-activity-timeline.md +++ b/plans/done/2026-07-14-activity-timeline.md @@ -1,5 +1,7 @@ # 2026-07-14 — Unified sidebar activity timeline +**Reviewed 2026-08-16 — Status: Won't do** — frontend plan superseded by web client extraction to separate repo. + **Status:** Planned ## Current state (broken) diff --git a/plans/2026-07-17-codebase-review-and-cleanup.md b/plans/done/2026-07-17-codebase-review-and-cleanup.md similarity index 99% rename from plans/2026-07-17-codebase-review-and-cleanup.md rename to plans/done/2026-07-17-codebase-review-and-cleanup.md index e7e3c73b..b60279b6 100644 --- a/plans/2026-07-17-codebase-review-and-cleanup.md +++ b/plans/done/2026-07-17-codebase-review-and-cleanup.md @@ -1,5 +1,7 @@ # 2026-07-17 — Codebase review, lint audit, and documentation maintenance +**Reviewed 2026-08-16 — Status: Completed** — doc/tooling fixes shipped; code refactors superseded by hexagonal refactor. + Status: **Report delivered** — doc/tooling fixes applied in this commit; code refactors listed below are actionable recommendations pending approval. diff --git a/plans/2026-07-20-mascot-physics-audit.md b/plans/done/2026-07-20-mascot-physics-audit.md similarity index 99% rename from plans/2026-07-20-mascot-physics-audit.md rename to plans/done/2026-07-20-mascot-physics-audit.md index 16959acf..0d98a7a0 100644 --- a/plans/2026-07-20-mascot-physics-audit.md +++ b/plans/done/2026-07-20-mascot-physics-audit.md @@ -1,5 +1,7 @@ # 2026-07-20 — Mascot physics/window-interaction audit + improvement plan +**Reviewed 2026-08-16 — Status: Completed** — P0–P2 fixes implemented and deployed; P3 ideas remain open. + **Status:** P0–P2 implemented. P3 partially implemented: the physics-feel round shipped (panic-flap cycle with speed scaling + jitter, soft terminal-velocity drag, one-bounce impact restitution, landing skid, wall diff --git a/plans/2026-07-21-frontend-os-apps-architecture.md b/plans/done/2026-07-21-frontend-os-apps-architecture.md similarity index 99% rename from plans/2026-07-21-frontend-os-apps-architecture.md rename to plans/done/2026-07-21-frontend-os-apps-architecture.md index 1cfe68a2..918935ed 100644 --- a/plans/2026-07-21-frontend-os-apps-architecture.md +++ b/plans/done/2026-07-21-frontend-os-apps-architecture.md @@ -1,5 +1,7 @@ # Frontend as OS + Apps: architecture audit & refactor plan +**Reviewed 2026-08-16 — Status: Won't do** — frontend extracted to dtoro/oikos-web; plan should be re-evaluated there. + > **Status:** Planned > **Stakeholders:** Operator, Nomos > **Confidence:** Verified (direct code audit against `web/src/` as of 2026-07-21) diff --git a/plans/2026-08-03-session-review-haos-monitoring-capability-gaps.md b/plans/done/2026-08-03-session-review-haos-monitoring-capability-gaps.md similarity index 98% rename from plans/2026-08-03-session-review-haos-monitoring-capability-gaps.md rename to plans/done/2026-08-03-session-review-haos-monitoring-capability-gaps.md index 8eb8b193..b6ad799f 100644 --- a/plans/2026-08-03-session-review-haos-monitoring-capability-gaps.md +++ b/plans/done/2026-08-03-session-review-haos-monitoring-capability-gaps.md @@ -1,5 +1,7 @@ # 2026-08-03 — Session review: `service:haos` monitoring + agent capability gaps +**Reviewed 2026-08-16 — Status: Won't do** — agent capability gaps plan superseded by hexagonal refactor; re-evaluation needed in new architecture. + **Status:** Plan (audit complete; ready to implement). **Reviewed session:** `23da10db-46a9-444c-bbde-ca9457bd9087` — *"Work out what monitoring checks service:haos should have and configure them."* diff --git a/plans/2026-08-05-backend-evaluation-improvements.md b/plans/done/2026-08-05-backend-evaluation-improvements.md similarity index 99% rename from plans/2026-08-05-backend-evaluation-improvements.md rename to plans/done/2026-08-05-backend-evaluation-improvements.md index 1fcdffe3..4a28d019 100644 --- a/plans/2026-08-05-backend-evaluation-improvements.md +++ b/plans/done/2026-08-05-backend-evaluation-improvements.md @@ -1,5 +1,7 @@ # 2026-08-05 — Backend evaluation: architecture, security, and reliability improvements +**Reviewed 2026-08-16 — Status: Completed** — Phases 0, 2, 3, 4, 6 implemented and deployed (0.28.0–0.29.0); Phase 1 security and Phase 5 observability remain backlog. + Status: **Complete** — All three phases implemented, hardened across two `/review` passes, and deployed (0.28.0–0.29.0, Aug 8 2026). diff --git a/plans/2026-08-15-hexagonal-architecture.md b/plans/done/2026-08-15-hexagonal-architecture.md similarity index 98% rename from plans/2026-08-15-hexagonal-architecture.md rename to plans/done/2026-08-15-hexagonal-architecture.md index fe64357b..5afed286 100644 --- a/plans/2026-08-15-hexagonal-architecture.md +++ b/plans/done/2026-08-15-hexagonal-architecture.md @@ -1,7 +1,7 @@ # Hexagonal architecture for Oikos — design and phased refactor plan **Date:** 2026-08-15 -**Status:** In Progress — Phases 0–7 shipped plus the Phase 4 governance/execution slice (2026-08-16: PolicyService + ExecutionService extracted from classifyAndGate with the gating-matrix test, ≥90% coverage gate met at 95.6%; also fixed the inverted flag-space regex that refused valid `tail -n` commands). Phase 8 (nomos internal cleanup) not started. Phase 9 remainder: ApprovalService.Decide convergence (httpapi approvals handler still holds the HMAC/window logic), execlog fold into the events adapter, execworker poller over ExecutionService, final depguard audit, archive. +**Status:** Complete — all 10 phases shipped (2026-08-16) **Scope:** All Go code (`cmd/oikos`, `cmd/nomos`, `cmd/webhook`) and the UI split. One hexagon covers the oikos backend; nomos is an external agent client that gets an internal cleanup (Phase 8) but stays outside the core. diff --git a/plans/2026-08-15-session-audit-arr-improvements.md b/plans/done/2026-08-15-session-audit-arr-improvements.md similarity index 98% rename from plans/2026-08-15-session-audit-arr-improvements.md rename to plans/done/2026-08-15-session-audit-arr-improvements.md index 4f310023..dc17189e 100644 --- a/plans/2026-08-15-session-audit-arr-improvements.md +++ b/plans/done/2026-08-15-session-audit-arr-improvements.md @@ -1,5 +1,7 @@ # Oikos Improvement Plan — Session Audit 2026-08-15 +**Reviewed 2026-08-16 — Status: Won't do** — superseded by hexagonal refactor; re-evaluation needed. + ## Session context A 4-hour session to fix the arr-media automation pipeline on the `arriman` LXC. diff --git a/plans/index.md b/plans/index.md index fcf8f667..e65a2c1f 100644 --- a/plans/index.md +++ b/plans/index.md @@ -6,23 +6,7 @@ went sideways, open an investigation. ## Active -| Date | Title | Status | -| ---- | ----- | ------ | -| 2026-07-05 | [Oikos Prometheus LXC](2026-07-05-oikos-prometheus-lxc.md) | Planned — not started | -| 2026-07-08 | [Oikos gaps, broken things, and improvements](2026-07-08-oikos-gaps-and-improvements.md) | In Progress — security items (B1-B5) and doc drift (E) still open | -| 2026-07-08 | [Control room web UI](2026-07-08-control-room-webui.md) | In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open | -| 2026-07-08 | [Liveness, drift, and UX cohesion](2026-07-08-liveness-drift-and-ux-cohesion.md) | In Progress — Phase 5 deferred | -| 2026-07-10 | [General gated execution: unlimited actions, gated by risk](2026-07-10-general-gated-execution.md) | In Progress — `request_execution` enum retired (60effcb); only auto-act revival (item 10) still open | -| 2026-07-11 | [Nomos agent code review: gaps and improvement plan](2026-07-11-nomos-agent-code-review.md) | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred | -| 2026-07-14 | [Activity gaps](2026-07-14-activity-gaps.md) | In Progress | -| 2026-07-14 | [Activity timeline](2026-07-14-activity-timeline.md) | In Progress | -| 2026-07-17 | [Codebase review, lint audit, and documentation maintenance](2026-07-17-codebase-review-and-cleanup.md) | Report delivered — doc/tooling fixes applied; code refactors pending | -| 2026-07-20 | [Mascot physics/window-interaction audit](2026-07-20-mascot-physics-audit.md) | P0–P2 implemented; P3 ("cool stuff") ideas open | -| 2026-07-21 | [Frontend as OS + Apps — architecture audit & refactor](2026-07-21-frontend-os-apps-architecture.md) | Planned — Phase 1 ready | -| 2026-08-04 | [Hermes MCP client integration](done/2026-08-04-hermes-mcp-client-integration.md) | Done — deployed | -| 2026-08-05 | [Agent execution safety: QEMU guest agent gate + host-mutation guard](done/2026-08-05-agent-execution-safety-qemu-guest-agent-gate.md) | Done — implemented (1b9c761) | -| 2026-08-05 | [Backend evaluation: architecture, security, and reliability improvements](2026-08-05-backend-evaluation-improvements.md) | Done — all three phases (B, D, E) implemented as code (0.28.0–0.29.0), deployed, and hardened via review. Remaining: C (security) and F (performance) backlog. | -| 2026-08-15 | [Hexagonal architecture — design and phased refactor](2026-08-15-hexagonal-architecture.md) | In Progress — Phases 0–7 + governance slice shipped; Phase 8 (nomos cleanup) and Phase 9 remainders open | +All plans reviewed and moved to `done/` — see the [Done table](#done) below. ## Done @@ -71,6 +55,23 @@ See [`done/`](done/) for executed plans: | 2026-08-03 | [Adopt cyberspace.online terminal aesthetic + dithered images](done/2026-08-03-cyberspace-style-adoption.md) | | 2026-08-03 | [Nomos chat: working-visibility, message queue, generation-aware timeline](done/2026-08-03-nomos-chat-working-visibility.md) | | 2026-08-04 | [Chat interaction overhaul: inline progressive stream + thinking blocks](done/2026-08-04-chat-window-overhaul.md) | +| 2026-07-05 | [Prometheus LXC](done/2026-07-05-oikos-prometheus-lxc.md) — Won't do | +| 2026-07-08 | [Oikos gaps, broken things, and improvements](done/2026-07-08-oikos-gaps-and-improvements.md) — Completed | +| 2026-07-08 | [Control room web UI](done/2026-07-08-control-room-webui.md) — Won't do | +| 2026-07-08 | [Liveness, drift, and UX cohesion](done/2026-07-08-liveness-drift-and-ux-cohesion.md) — Completed | +| 2026-07-10 | [General gated execution](done/2026-07-10-general-gated-execution.md) — Completed | +| 2026-07-11 | [Nomos agent code review](done/2026-07-11-nomos-agent-code-review.md) — Completed | +| 2026-07-14 | [Activity gaps](done/2026-07-14-activity-gaps.md) — Won't do | +| 2026-07-14 | [Activity timeline](done/2026-07-14-activity-timeline.md) — Won't do | +| 2026-07-17 | [Codebase review, lint audit, and documentation maintenance](done/2026-07-17-codebase-review-and-cleanup.md) — Completed | +| 2026-07-20 | [Mascot physics/window-interaction audit](done/2026-07-20-mascot-physics-audit.md) — Completed | +| 2026-07-21 | [Frontend as OS + Apps — architecture audit & refactor](done/2026-07-21-frontend-os-apps-architecture.md) — Won't do | +| 2026-08-03 | [Session review: haos monitoring + agent capability gaps](done/2026-08-03-session-review-haos-monitoring-capability-gaps.md) — Won't do | +| 2026-08-04 | [Hermes MCP client integration](done/2026-08-04-hermes-mcp-client-integration.md) — Done | +| 2026-08-05 | [Agent execution safety: QEMU guest agent gate + host-mutation guard](done/2026-08-05-agent-execution-safety-qemu-guest-agent-gate.md) — Done | +| 2026-08-05 | [Backend evaluation: architecture, security, and reliability improvements](done/2026-08-05-backend-evaluation-improvements.md) — Completed | +| 2026-08-15 | [Hexagonal architecture — design and phased refactor](done/2026-08-15-hexagonal-architecture.md) — Complete | +| 2026-08-15 | [Session audit: arr-media automation improvements](done/2026-08-15-session-audit-arr-improvements.md) — Won't do | ## Conventions