12 of 33 MCP tools now render as rich inline cards instead of raw JSON: EntityCard, HealthSummary, LXCList, EntityTable, KnowledgeResults, BlastRadius, ChangeLog, FleetSnapshot, MetricChart. Architecture: - Server: annotateJSONResult() wraps queryRows with __renderer hints - Registry: match/dispatch system maps tool names to Svelte components - Chat: inline dispatch with 5-card limit, overflow to collapsed group - ToolCallGroup: unmatched prop, hides when all matched, ARIA labels Tests: 3 new Go tests for annotateJSONResult (wrap, no-op, multi-row).
4.3 KiB
4.3 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned — not started |
| 2026-07-08 | Oikos gaps, broken things, and improvements | In Progress — security items (B1-B5) and doc drift (E) still open |
| 2026-07-08 | Control room web UI | In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open |
| 2026-07-08 | Liveness, drift, and UX cohesion | In Progress — Phase 5 deferred |
| 2026-07-10 | General gated execution: unlimited actions, gated by risk | In Progress — enum retirement + auto-act revival still open |
| 2026-07-11 | Nomos agent code review: gaps and improvement plan | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred |
Done
See done/ for executed plans:
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.