Files
oikos/plans/index.md
dtoro 1267c39ab1
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
Desktop App / Build Linux (amd64) (push) Has been cancelled
Desktop App / Attach to Release (push) Has been cancelled
docs(plans): mark OIDC token-refresh fix as shipped (3b98097)
The OIDC fix was committed in 3b98097 by a concurrent session. The plan's
status block was stale ('not yet committed/deployed') — updated to reflect
it's done. No remaining open items in this plan.
2026-07-14 21:31:38 +02:00

5.0 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned — not started
2026-07-08 Oikos gaps, broken things, and improvements In Progress — security items (B1-B5) and doc drift (E) still open
2026-07-08 Control room web UI In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open
2026-07-08 Liveness, drift, and UX cohesion In Progress — Phase 5 deferred
2026-07-10 General gated execution: unlimited actions, gated by risk In Progress — request_execution enum retired (60effcb); only auto-act revival (item 10) still open
2026-07-11 Nomos agent code review: gaps and improvement plan In Progress — only C1 (unauthenticated nomos gateway) still open, deferred
2026-07-14 Session reliability & UX audit Done — all 21 fixes deployed
2026-07-14 Tool timeline in sidebar Done — deployed v0.3.2
2026-07-14 Unified agent activity indicator Done — deployed v0.3.3
2026-07-14 Post-fix session remainders: empty responses & plan drift Done — all 18 fixes shipped, eval-validated (4/4 golden evals pass), committed (337d577 + 3de359b + dd3076a), deployed v0.5.3. OIDC token-refresh fix (PM) also shipped (3b98097)

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-08 Fix MCP analysis tools
2026-07-06 Consolidate Oikos control plane onto mac-mini
2026-07-08 Signal triggers: host health checks
2026-07-08 Plan vs implementation cross-reference
2026-07-08 Nomos resident agent (renames Hermes)
2026-07-09 Chat sessions: reliability, cost, and session-management fixes
2026-07-09 Session execution, UX, and learning improvements
2026-07-10 Autonomous plan execution: close the observation gap
2026-07-11 Tasks: the chat page as goal-structured autonomous work
2026-07-11 Concurrent task execution: safety + throughput + frontend correctness
2026-07-11 UI review: information architecture, usability, and best practices
2026-07-11 Task completion safety net: every live task is stuck "Running"
2026-07-12 Wails desktop application
2026-07-13 MCP tool apps: custom in-chat renderers

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.