Traced during UI-review verification: 50/50 live sessions are stuck active/planning, never done/failed. Root cause confirmed against the running DB — set_goal called once, propose_plan and complete_task called zero times across all 50 sessions. The model consistently skips the terminal complete_task call despite SOUL.md explicitly instructing it to, especially for trivial single-tool Q&A turns. Plan proposes an inline safety net for the common case plus an idle sweep for structured goal/plan sessions that stall. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
4.0 KiB
4.0 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned — not started |
| 2026-07-08 | Oikos gaps, broken things, and improvements | In Progress — security items (B1-B5) and doc drift (E) still open |
| 2026-07-08 | Control room web UI | In Progress |
| 2026-07-08 | Liveness, drift, and UX cohesion | In Progress — Phase 5 deferred |
| 2026-07-10 | General gated execution: unlimited actions, gated by risk | In Progress — enum retirement + auto-act revival still open |
| 2026-07-11 | Nomos agent code review: gaps and improvement plan | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred |
| 2026-07-11 | Task completion safety net: every live task is stuck "Running" | Planned — not started |
Done
See done/ for executed plans:
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.