oikos/plans/index.md
dtoro 7660e5681c complete consolidation plan — scripts, watchdog, rollback runbook
Plan #1 at 98% (code complete). Three fixes applied to remaining cutover items:

1. watchdog.sh — dual-path health checking (LAN 192.168.8.175 + mesh/Caddy
   proxy). Only pages when BOTH paths fail. Partial failure logged but not
   paged (distinguishes stack problem from mesh/Caddy issue).

2. deploy.sh — pre-deploy pg_dump before each deploy saves to
   /opt/oikos/backups/pre-deploy-<sha>.sql. Rollback script now has a
   guaranteed recovery point.

3. docs/operations/rollback.md — runbook documenting automated rollback,
   manual recovery, decision tree, backup schedule, and rehearsal log.

Two operational items remain (require operator on Proxmox/Gitea):
- Remove Gitea webhooks ids 10, 11 from dtoro/Homelab-Docs
- Archive apps/105 LXC (pct stop 105 + archive)

All active config (seeds, compose, scripts) is already clean of apps/105 refs.
Infisical bootstrap code is complete (bootstrap-infisical.sh + Go backend).
2026-07-08 11:25:43 +02:00

2.1 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned
2026-07-08 Plan vs implementation cross-reference Planned

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-06 Consolidate Oikos control plane onto mac-mini

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.