Every finding from the review is now implemented and verified live: A1 (3919ec3), B1+B2 (c5ffaec), A3 (926969a), D1-D3 (76f7630), A2 (c390164), B3 (6d4f6de), F1 (11c18e8). C1 (nomos gateway has no authentication) remains explicitly deferred per operator instruction. Kept in plans/ (not moved to done/) since C1 is still open, matching how other partially-complete plans in this index are tracked. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
3.8 KiB
3.8 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned — not started |
| 2026-07-08 | Oikos gaps, broken things, and improvements | In Progress — security items (B1-B5) and doc drift (E) still open |
| 2026-07-08 | Control room web UI | In Progress |
| 2026-07-08 | Liveness, drift, and UX cohesion | In Progress — Phase 5 deferred |
| 2026-07-10 | General gated execution: unlimited actions, gated by risk | In Progress — enum retirement + auto-act revival still open |
| 2026-07-11 | Nomos agent code review: gaps and improvement plan | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred |
Done
See done/ for executed plans:
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.