Files
oikos/plans/index.md
dtoro 6932eb5eed docs: plan concurrent task execution; archive completed tasks plan
New plan grounds three concurrency issues found by tracing the actual code
(not assumed): the assent/destructive windows are keyed by agent id only
(no session dimension), so an approved plan in one task can auto-run
unapproved actions in a concurrently-running task; nomos shares one
mutex-guarded MCP client across all sessions, so a single slow `run` call
serializes every other task's tool calls behind it; and chat.ts's SSE
callback has no session guard, so switching tasks mid-stream lets the
backgrounded task's events corrupt whatever's now displayed. Proposes
session-scoping the windows (critical/first), a frontend stream guard
(contained/second), a per-session MCP client pool (throughput/third), and
an optional concurrency cap (deferred pending real usage data).

Also archives the goal-oriented-chat-control-panel plan to done/ — all 7
phases shipped and are live in production (SHA e30813a) — fixing its
internal relative links for the new depth and pointing forward to the new
concurrency plan as follow-up hardening.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-11 18:14:35 +02:00

3.6 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned — not started
2026-07-08 Oikos gaps, broken things, and improvements In Progress — security items (B1-B5) and doc drift (E) still open
2026-07-08 Control room web UI In Progress
2026-07-08 Liveness, drift, and UX cohesion In Progress — Phase 5 deferred
2026-07-10 General gated execution: unlimited actions, gated by risk In Progress — enum retirement + auto-act revival still open
2026-07-11 Concurrent task execution: safety + throughput + frontend correctness Planned

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-08 Fix MCP analysis tools
2026-07-06 Consolidate Oikos control plane onto mac-mini
2026-07-08 Signal triggers: host health checks
2026-07-08 Plan vs implementation cross-reference
2026-07-08 Nomos resident agent (renames Hermes)
2026-07-09 Chat sessions: reliability, cost, and session-management fixes
2026-07-09 Session execution, UX, and learning improvements
2026-07-10 Autonomous plan execution: close the observation gap
2026-07-11 Tasks: the chat page as goal-structured autonomous work

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.