Files
oikos/plans/index.md
dtoro 9d9cbb63c4
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
plans: rename resident agent Hermes -> Nomos, add implementable rename phase N0
Nomos (from oikonomos, steward of the oikos) avoids the name collision
with Nous Research's Hermes Agent. N0 enumerates the full rename scope:
cmd/, hermes/ dir, env vars, config fields, compose service, Caddy vhost,
identity-preserving DB slug migration + seed update, persona docs.
History, the Matrix bot user, and legacy bin/hermes stay untouched.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-08 13:47:24 +02:00

2.5 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned
2026-07-08 Plan vs implementation cross-reference Planned
2026-07-08 Oikos gaps, broken things, and improvements Planned
2026-07-08 Control room web UI Planned
2026-07-08 Nomos resident agent (renames Hermes) Planned

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-08 Fix MCP analysis tools
2026-07-06 Consolidate Oikos control plane onto mac-mini

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.