Files
oikos/plans/index.md
dtoro 8b50753746
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
feat(chat): MCP tool apps — custom inline renderers for 12 tools
12 of 33 MCP tools now render as rich inline cards instead of raw JSON:
EntityCard, HealthSummary, LXCList, EntityTable, KnowledgeResults,
BlastRadius, ChangeLog, FleetSnapshot, MetricChart.

Architecture:
- Server: annotateJSONResult() wraps queryRows with __renderer hints
- Registry: match/dispatch system maps tool names to Svelte components
- Chat: inline dispatch with 5-card limit, overflow to collapsed group
- ToolCallGroup: unmatched prop, hides when all matched, ARIA labels

Tests: 3 new Go tests for annotateJSONResult (wrap, no-op, multi-row).
2026-07-13 22:46:56 +02:00

4.3 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned — not started
2026-07-08 Oikos gaps, broken things, and improvements In Progress — security items (B1-B5) and doc drift (E) still open
2026-07-08 Control room web UI In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open
2026-07-08 Liveness, drift, and UX cohesion In Progress — Phase 5 deferred
2026-07-10 General gated execution: unlimited actions, gated by risk In Progress — enum retirement + auto-act revival still open
2026-07-11 Nomos agent code review: gaps and improvement plan In Progress — only C1 (unauthenticated nomos gateway) still open, deferred

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-08 Fix MCP analysis tools
2026-07-06 Consolidate Oikos control plane onto mac-mini
2026-07-08 Signal triggers: host health checks
2026-07-08 Plan vs implementation cross-reference
2026-07-08 Nomos resident agent (renames Hermes)
2026-07-09 Chat sessions: reliability, cost, and session-management fixes
2026-07-09 Session execution, UX, and learning improvements
2026-07-10 Autonomous plan execution: close the observation gap
2026-07-11 Tasks: the chat page as goal-structured autonomous work
2026-07-11 Concurrent task execution: safety + throughput + frontend correctness
2026-07-11 UI review: information architecture, usability, and best practices
2026-07-11 Task completion safety net: every live task is stuck "Running"
2026-07-12 Wails desktop application
2026-07-13 MCP tool apps: custom in-chat renderers

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.