Files
oikos/plans/index.md
dtoro 60effcb2fe
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
Desktop App / Build Linux (amd64) (push) Has been cancelled
Desktop App / Attach to Release (push) Has been cancelled
session reliability: reconnect, knowledge loop, retire request_execution
Phase 1 — crash recovery: SSE auto-reconnect + backoff, polling gate
during disconnect, connection banner with retry button, empty-response
retry 3x, non-terminal resume on empty response, persistent error cards.

Phase 2/4 — visibility + continuation: custom ExecutionStatus renderer,
approvals extracted on every tool_result (not just done), activity bar
with status/goal, SessionDigest live polling, Continue button.

Phase 3 — cleanup: complete_task auto-cancels orphaned approvals,
deletes assent/destructive window keys, propose_plan marks pending
steps as replaced, plan step seq-order enforcement.

Phase 5 — knowledge loop: list_lxcs state filter (active/destroyed),
SOUL.md unmissable writeback section, propose_plan validation nudge,
complete_task writeback check, upsert_knowledge about array support,
plan generation grouping in frontend, session approval count badge.

Retire request_execution — all mutations now route through run.
Updated SOUL.md, AGENTS.md, CLIENTS.md, skills, and agent system notes.

Migration 020: plan step generation column, audit_log session_id index,
nomos_plan_executions pending-approval index.
2026-07-14 11:03:23 +02:00

4.4 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned — not started
2026-07-08 Oikos gaps, broken things, and improvements In Progress — security items (B1-B5) and doc drift (E) still open
2026-07-08 Control room web UI In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open
2026-07-08 Liveness, drift, and UX cohesion In Progress — Phase 5 deferred
2026-07-10 General gated execution: unlimited actions, gated by risk In Progress — enum retirement + auto-act revival still open
2026-07-11 Nomos agent code review: gaps and improvement plan In Progress — only C1 (unauthenticated nomos gateway) still open, deferred
2026-07-14 Session reliability & UX audit Planned — just audited, not started

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-08 Fix MCP analysis tools
2026-07-06 Consolidate Oikos control plane onto mac-mini
2026-07-08 Signal triggers: host health checks
2026-07-08 Plan vs implementation cross-reference
2026-07-08 Nomos resident agent (renames Hermes)
2026-07-09 Chat sessions: reliability, cost, and session-management fixes
2026-07-09 Session execution, UX, and learning improvements
2026-07-10 Autonomous plan execution: close the observation gap
2026-07-11 Tasks: the chat page as goal-structured autonomous work
2026-07-11 Concurrent task execution: safety + throughput + frontend correctness
2026-07-11 UI review: information architecture, usability, and best practices
2026-07-11 Task completion safety net: every live task is stuck "Running"
2026-07-12 Wails desktop application
2026-07-13 MCP tool apps: custom in-chat renderers

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.