Files
oikos/plans/index.md
dtoro 544afae77f
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
ci / web (push) Has been cancelled
Desktop App / Build Linux (amd64) (push) Has been cancelled
Desktop App / Attach to Release (push) Has been cancelled
feat(nomos): retry cap, vm: targets, inspect_path, goal supersession, runbooks
Session-review implementation for the three sessions audited in
plans/2026-07-18-session-review-three-sessions.md. v0.7.11 → v0.7.12.

P0.1 — retry cap + investigate-before-retry (cmd/nomos/retrycap.go,
agent.go): after 3 identical failing run calls in a single turn, refuse
to dispatch the call again and return a directive to investigate *why*
(ps/strace/lsof) or surface the blocker. Per-turn scope so a fresh turn
after the operator responds can retry once more. Session 1e9c7691's 20+
identical chown retries (knfsd held a kernel lock on the exported NFS
dir) is the direct motivation.

P0.2 + P1.8 + P2.10 — SOUL.md guidance: hung command is not a failed
command (investigate before retry); ask before proposing a multi-step
migration; multi-goal sessions summarize the arc not just the last goal.

P1.3 — two new runbook entities in seeds/knowledge.yaml:
  - nfs-exported-dir-mutation-hang (the knfsd fchownat lock procedure:
    killall → exportfs -u → mutate → exportfs -a → verify)
  - netbird-mgmt-oidc-race-after-upgrade (docker restart netbird-mgmt
    after ~30s for the traefik/authentik OIDC race)

P1.4 — setGoal emits task.superseded event when prior goal is overwritten
by a different goal (store.go, TestSetGoal_SupersededEvent). Session
55927f0a had two set_goal calls with the first silently abandoned.

P1.5 — inspect_path MCP tool: runs mount/df/ls/stat for one path across
up to 8 targets in one parallel call, replacing the 15+ run-call
fact-gathering fan-out sessions 1 and 2 each spent on cross-target path
tracing (tools.go, server.go: inspectPathAcrossTargets, inspectOneTarget).

P1.6 — vm: target support in run via qm guest exec (no more SSH-hop
with nested quoting). Extracted shared resolveProxmoxHostSlug for
LXC + VM, with hosts-relationship fallback when attributes.host is
absent (server.go, tools.go). Session 55927f0a's SSH-hop workarounds
for vm:zimaos are the direct motivation.

Deferred (documented in plan): P1.7 (approval window auto-extend on
timeout) and P2.9 (long-running command PENDING detection) — both
addressed at lower cost by the retry cap. Session 3's poll-after-timeout
pattern already works; the cap protects against the failure mode.
2026-07-19 00:09:39 +02:00

5.5 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned — not started
2026-07-08 Oikos gaps, broken things, and improvements In Progress — security items (B1-B5) and doc drift (E) still open
2026-07-08 Control room web UI In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open
2026-07-08 Liveness, drift, and UX cohesion In Progress — Phase 5 deferred
2026-07-10 General gated execution: unlimited actions, gated by risk In Progress — request_execution enum retired (60effcb); only auto-act revival (item 10) still open
2026-07-11 Nomos agent code review: gaps and improvement plan In Progress — only C1 (unauthenticated nomos gateway) still open, deferred
2026-07-14 Activity gaps In Progress
2026-07-14 Activity timeline In Progress
2026-07-17 Codebase review, lint audit, and documentation maintenance Report delivered — doc/tooling fixes applied; code refactors pending
2026-07-18 Session review: three recent sessions Implemented in v0.7.12 — P0.1/P0.2/P1.3/P1.4/P1.5/P1.6/P1.8/P2.10; P1.7 and P2.9 deferred (retry cap covers)

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-08 Fix MCP analysis tools
2026-07-06 Consolidate Oikos control plane onto mac-mini
2026-07-08 Signal triggers: host health checks
2026-07-08 Plan vs implementation cross-reference
2026-07-08 Nomos resident agent (renames Hermes)
2026-07-09 Chat sessions: reliability, cost, and session-management fixes
2026-07-09 Session execution, UX, and learning improvements
2026-07-10 Autonomous plan execution: close the observation gap
2026-07-11 Tasks: the chat page as goal-structured autonomous work
2026-07-11 Concurrent task execution: safety + throughput + frontend correctness
2026-07-11 UI review: information architecture, usability, and best practices
2026-07-11 Task completion safety net: every live task is stuck "Running"
2026-07-12 Wails desktop application
2026-07-13 MCP tool apps: custom in-chat renderers
2026-07-14 Session reliability & UX audit
2026-07-14 Tool timeline in sidebar
2026-07-14 Unified agent activity indicator
2026-07-14 Post-fix session remainders: empty responses & plan drift
2026-07-15 Plan-first and iteration
2026-07-15 WhatsApp session audit

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.