fix(agent): refuse plan re-proposal + emit done on error (close divergence chain)
Operator-reported bug: on 'proceed with the rest' the agent re-proposed the
plan, duplicating it in the sidebar. Root cause was a three-bug chain, not
one bug:

1. Trigger — model empty-response on 'proceed' (approval vocabulary didn't
   list 'proceed', so the agent wasn't sure it was approved and no-op'd).
2. Amplifier — chatWith emitted 'error' without 'done' on empty response
   (agent.go:370). The frontend's onComplete saw !receivedDone and
   misclassified the model failure as a network disconnect, calling
   handleDisconnect -> resumeSession.
3. Divergence — the reconnect note was generic ('report your state'), so
   the agent re-proposed + re-executed instead of advancing the plan.

Fixes (shipped, e2e-validated against the live agent on oikos-nomos-1):

- A.2: proposePlan refuses re-proposal once a step has started (returns
  errPlanInFlight). Drops the append-mode safety net (commit 5384499) that
  was the direct source of the sidebar duplication. The agent must advance
  with update_plan_step + run; the tool result directs it.
- A.1: proposePlan sets the 'generation' column on INSERT (migration 020
  added the column + frontend grouping, but the INSERT never wired it).
- A.3: propose_plan tool description restated as a crisp contract (ONCE,
  STOP and wait, REFUSES once a step started, advance with update_plan_step).
- F.3: approval vocabulary expanded to approved/yes/go/proceed/continue/ok/
  go ahead; propose_plan result string tightened to an imperative.
- B.1: chatWith emits 'done' after 'error' on every terminal path via a new
  emitError helper. The frontend now treats model errors as ended (not
  disconnected), so no auto-reconnect -> resumeSession fires.
- B.2: reconnect/resume note carries the operator's last message + an
  explicit 'advance the plan, do NOT call propose_plan again' directive when
  a plan is in flight. Wired into all 4 resume entry points (reconnect,
  /resume, idle-sweep, question-answer) via enrichResumeNote.
- B.3: resumeSession escalates the recovery note across its 3 attempts (final
  retry: 'pick the lowest-pending step, mark it running, call run — do that
  now') instead of 3 identical notes -> 3 identical empties.

Verification: TestProposePlan_RefuseInFlight replaces TestProposePlan_
AppendVsReplace. e2e conversations against the rebuilt container:
  conv2 ('proceed with the rest') -> 0 propose_plan calls, plan stayed at
    3 steps (was 6+ before), update_plan_step x5 + run x2 + complete_task.
  conv3 (full plan, 'go ahead') -> apt-get update on lxc:dns auto-ran under
    the plan window, update_entity_attributes writeback, clean complete_task.
  nomos logs show zero reconnect/resume entries for the plan-proposing
    sessions (the three-bug chain is closed).

Remaining (not in this commit): D.1 refuse complete_task without writeback
(next blocker), C.1/C.2, F.1/F.2 SOUL.md consolidation, B.4-B.6, E.1/E.2.
See plans/2026-07-14-post-fix-session-remainders.md.

Also: re-audit 2026-07-10-general-gated-execution.md — request_execution enum
retirement (60effcb) closes item 9; only auto-act revival (item 10) remains.

Version 0.4.1 -> 0.5.0 (minor: new structural behavior, not a bugfix).
2026-07-14 15:28:33 +02:00

4.9 KiB

Plans

Pre-flight runbooks for planned changes. When a plan is executed, move it to done/ and add changelog entries on affected node pages. If things went sideways, open an investigation.

Active

Date Title Status
2026-07-05 Oikos Prometheus LXC Planned — not started
2026-07-08 Oikos gaps, broken things, and improvements In Progress — security items (B1-B5) and doc drift (E) still open
2026-07-08 Control room web UI In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open
2026-07-08 Liveness, drift, and UX cohesion In Progress — Phase 5 deferred
2026-07-10 General gated execution: unlimited actions, gated by risk In Progress — request_execution enum retired (60effcb); only auto-act revival (item 10) still open
2026-07-11 Nomos agent code review: gaps and improvement plan In Progress — only C1 (unauthenticated nomos gateway) still open, deferred
2026-07-14 Session reliability & UX audit Done — all 21 fixes deployed
2026-07-14 Tool timeline in sidebar Done — deployed v0.3.2
2026-07-14 Unified agent activity indicator Done — deployed v0.3.3
2026-07-14 Post-fix session remainders: empty responses & plan drift In Progress — Phases A + B.1-B.3 + F.3 shipped & e2e-validated (v0.5.0); Phases C, D, E, F.1-F.2 remain (D.1 is the next blocker)

Done

See done/ for executed plans:

Date Title
2026-06-01 Slate AX → SODOLA managed switch migration
2026-06-04 Deprecate claudio-bot
2026-06-25 Yuvomi deployment — house.hubris.network
2026-06-29 Grimmory migration — Booklore → dedicated LXC
2026-06-24 TRMNL plugins LXC (128) + middleware deploy pipeline
2026-07-06 Adopt wiki-hq doc architecture
2026-07-07 MCP tool completion — Hermes operator interface
2026-07-07 DB as single source of truth for agent knowledge
2026-07-07 Comprehensive audit: stale files, state gaps, and next steps
2026-07-07 Client lifecycle in Go — enrollment through deprecation
2026-07-08 Fix MCP analysis tools
2026-07-06 Consolidate Oikos control plane onto mac-mini
2026-07-08 Signal triggers: host health checks
2026-07-08 Plan vs implementation cross-reference
2026-07-08 Nomos resident agent (renames Hermes)
2026-07-09 Chat sessions: reliability, cost, and session-management fixes
2026-07-09 Session execution, UX, and learning improvements
2026-07-10 Autonomous plan execution: close the observation gap
2026-07-11 Tasks: the chat page as goal-structured autonomous work
2026-07-11 Concurrent task execution: safety + throughput + frontend correctness
2026-07-11 UI review: information architecture, usability, and best practices
2026-07-11 Task completion safety net: every live task is stuck "Running"
2026-07-12 Wails desktop application
2026-07-13 MCP tool apps: custom in-chat renderers

Conventions

  • File name: YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date.
  • Status: PlannedIn ProgressDone (move to done/ on completion).
  • When done: add a changelog entry on every affected node page, then move the file to done/.
  • Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.