Move ten completed plans from plans/ to plans/done/ and update the index:
- 2026-07-18 session-review-three-sessions, 2026-07-20 desktop-mascot,
2026-07-20 session-review-ten-sessions, 2026-07-21 chat-full-polish,
2026-07-29 health-check-reality-and-knowledge-graph,
2026-07-30 session-review-plan-drift, and the four 2026-08-03 chat plans
(changes-review, reliability-and-ux-audit, cyberspace-style-adoption,
working-visibility).
- Refresh two stale statuses: cyberspace-style-adoption ("Draft" -> shipped as
full replacement in v0.16.0/757ef2f) and health-check-reality ("ready for
implementation" -> shipped across the v0.14.x-0.16.x check commits).
- .gitignore: ignore local tooling artifacts (.playwright-mcp/, config-screen.png).
No code change. index.md Active/Done tables now match the filesystem (no orphans).
VERSION: 0.17.0 -> 0.17.1
6.7 KiB
6.7 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned — not started |
| 2026-07-08 | Oikos gaps, broken things, and improvements | In Progress — security items (B1-B5) and doc drift (E) still open |
| 2026-07-08 | Control room web UI | In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open |
| 2026-07-08 | Liveness, drift, and UX cohesion | In Progress — Phase 5 deferred |
| 2026-07-10 | General gated execution: unlimited actions, gated by risk | In Progress — request_execution enum retired (60effcb); only auto-act revival (item 10) still open |
| 2026-07-11 | Nomos agent code review: gaps and improvement plan | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred |
| 2026-07-14 | Activity gaps | In Progress |
| 2026-07-14 | Activity timeline | In Progress |
| 2026-07-17 | Codebase review, lint audit, and documentation maintenance | Report delivered — doc/tooling fixes applied; code refactors pending |
| 2026-07-20 | Mascot physics/window-interaction audit | P0–P2 implemented; P3 ("cool stuff") ideas open |
| 2026-07-21 | Frontend as OS + Apps — architecture audit & refactor | Planned — Phase 1 ready |
Done
See done/ for executed plans:
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.