D.1 (complete_task refused without writeback) and D.2 (propose_plan
auto-appends writeback step) shipped in 3de359b (v0.5.1), e2e-validated
against the live agent. The knowledge loop is now structurally closed —
no blockers remain. Remaining items (F.1, F.2, C.1, C.2, B.4-B.6, E.1,
E.2) are all friction/cosmetic.
5.1 KiB
5.1 KiB
Plans
Pre-flight runbooks for planned changes. When a plan is executed, move it to
done/ and add changelog entries on affected node pages. If things
went sideways, open an investigation.
Active
| Date | Title | Status |
|---|---|---|
| 2026-07-05 | Oikos Prometheus LXC | Planned — not started |
| 2026-07-08 | Oikos gaps, broken things, and improvements | In Progress — security items (B1-B5) and doc drift (E) still open |
| 2026-07-08 | Control room web UI | In Progress — packaging/auth sections superseded by the Wails plan's Phase 0 (client/server split); M4 still open |
| 2026-07-08 | Liveness, drift, and UX cohesion | In Progress — Phase 5 deferred |
| 2026-07-10 | General gated execution: unlimited actions, gated by risk | In Progress — request_execution enum retired (60effcb); only auto-act revival (item 10) still open |
| 2026-07-11 | Nomos agent code review: gaps and improvement plan | In Progress — only C1 (unauthenticated nomos gateway) still open, deferred |
| 2026-07-14 | Session reliability & UX audit | Done — all 21 fixes deployed |
| 2026-07-14 | Tool timeline in sidebar | Done — deployed v0.3.2 |
| 2026-07-14 | Unified agent activity indicator | Done — deployed v0.3.3 |
| 2026-07-14 | Post-fix session remainders: empty responses & plan drift | In Progress — Phases A + B.1-B.3 + F.3 + D.1 + D.2 shipped, e2e-validated, committed (337d577 + 3de359b), deployed v0.5.1. Knowledge loop structurally closed. Phases C, E, F.1-F.2, B.4-B.6 remain (no blockers). PM: OIDC token-refresh fix (root-cause for empty graphs) implemented, not yet committed/deployed |
Done
See done/ for executed plans:
Conventions
- File name:
YYYY-MM-DD-<slug>.md. Use the target date if known, otherwise the planning date. - Status:
Planned→In Progress→Done(move todone/on completion). - When done: add a changelog entry on every affected node page, then move the file to
done/. - Plans are append-only once execution starts — don't rewrite pre-flight intent after the fact.