Commit Graph

3 Commits

Author SHA1 Message Date
b98d7c24bf feat: Phase 9 gaps closed — ApprovalService.Decide convergence, execlog fold, execworker poller
Some checks are pending
ci / build-test (push) Waiting to run
ci / docker-build (push) Waiting to run
- ApprovalService (core/app/approval.go) + ApprovalRepo (postgres adapter) with
  full decide transaction: HMAC token verify, approval flip, execution un-gate,
  session-scoped window keys (+session suffix matching GovernanceStore gate),
  nomos session flip, audit+event on failure abort. httpapi DecideApproval now
  a thin presenter delegating to the service. ListPending payload format fixed
  (json.Unmarshal not raw-wrap).
- execlog folded into postgres adapter: internal/execlog deleted, NewExecutionLog
  / ReadExecutionLog live in the db package, callers updated (mcp, httpapi).
- execworker poller over ExecutionService.DispatchQueued: advisory lock leak
  fixed (defer/recover per execution), correlation_id preserved via Finalize
  event emission (ExecRunRepo.Finalize now emits execution.{status} with
  correlation_id from the row).
- Phase 8 session export-rename completed: Store, New, and all 53 methods
  exported; cmd/nomos/ agent.go fixed to use session.PendingContinuation etc.
- Coverage gates: ExecutionService.Submit 93.1%, PolicyService.Decide 100%.
- Plans index updated, VERSION bumped to 0.36.0.
2026-08-16 12:29:59 +02:00
64f7d54011 feat: Phase 2 — ports package, secrets port move, postgres adapter move
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
Problem: the hexagon's Phase 2 (plans/2026-08-15-hexagonal-architecture.md)
must give the use-cases-to-be their contract surface: driven-port
interfaces, test fakes, the secrets interface moved into core, and the
postgres package inside the adapters tree — before the first vertical
slice (Phase 3) can wire a composition root.

Change:
- internal/core/ports: full driven-port catalog per plan §3.3 —
  repositories as transaction-scoped aggregates whose inputs carry
  derived checks, audit, and events (§3.6), plus CommandExecutor,
  TargetResolver, Checker, Secrets, EventPublisher, Provisioner.
  Port-local payload types (Event, AuditEntry, CheckDef, KnowledgeEntry,
  ExecResult) keep signatures off infrastructure; TypeTree aliases
  internal/ontology (pure over domain) until checkdefaults is absorbed.
  ReadModels intentionally not declared yet — it materializes with the
  Phase 3 slice and grows as report handlers rewire.
- secrets.Backend is now an alias of ports.Secrets; implementations
  (Infisical, SOPS, Manager) unchanged. mcp's local secretBackend
  subset is deleted; tool constructors take ports.Secrets.
- internal/db → internal/adapters/postgres (mechanical import rewrite;
  package identifier stays db until the Phase 3 repository split).
  sqlc.yaml, Makefile, golangci exclusions, and docs follow the move;
  make generate-check verified.
- internal/adapters/ssh: Executor implements ports.CommandExecutor over
  the actuator dial pool + RunStreaming (10-min default timeout carried
  over from the httpapi path).
- internal/adapters/remote: Resolver implements ports.TargetResolver
  delegating to internal/remote (still pool-based; drops onto
  ports.EntityRepository when repositories land in Phase 3 — documented
  transitional import).
- internal/core/ports/portstest: importable fakes — in-memory
  EntityRepo (with check-then-act SetState, side-effect recording),
  RecordingExecutor, FakeChecker, SpyPublisher; port-satisfaction
  guards; tests.

Risk: ports are declared ahead of implementations — signatures firm up
per phase as slices land (documented in the package doc); the
remote→postgres transitional import is explicit and dissolves in
Phase 3.

Verification: go vet, make test (race, 19 packages), generate-check,
golangci on core+adapters — 0 issues; full-repo baseline down
365→344.
2026-08-15 22:56:56 +02:00
5e10437fe3 Phase 4 (Performance) + Phase 6 (Infrastructure) completion
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
ci / web (push) Has been cancelled
Desktop App / Build Linux (amd64) (push) Has been cancelled
Desktop App / Attach to Release (push) Has been cancelled
Phase 4 — Performance:
- F1: SSH DialPool with key-by-host pooling and 5min idle TTL
- F2: In-memory entity lookup cache (TTL 60s, HTTP resolveEntityID)
- F3: Trigram GIN indexes on entities.slug and entities.name (migration 031)
- F4: Partial index on executions(classification_id) for auto-act (migration 032)
- Added missing RunOutput and RunStreaming in actuator/ (E3 gap fill)

Phase 6 — Infrastructure:
- H1: Infisical image pinned to v0.99.1
- H2: execworker daemon — polls pending executions with per-execution
  advisory locks, recovers orphaned running executions, wired as
  docker-compose service
- H3: splitSQL hardened with block comment and string-literal support,
  6 new edge-case tests (11 total)
- H4: Scheduler acquires pg_try_advisory_lock(0x01c05e6) at startup
2026-08-08 23:46:43 +02:00