|
|
a0f059d19f
|
cutover: apps/105 Python services stopped — Go Docker stack live
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
- Stopped and disabled 5 services on apps/105: homelab-mcp-deploy,
secrets-issuance, secrets-issuance-deploy, oikos-console,
oikos-console-deploy.
- Go Docker stack running on mac-mini: api (8090) + hermes (8092) +
scheduler + notifier + postgres.
- Watchdog cron installed (every 2min → scripts/watchdog.sh).
- DB backup at backups/pre-cutover-20260707.sql (145K).
- All 14 verification checks pass.
- .gitignore: added backups/ and bin/ patterns.
- Pending: Caddy DNS push, rollback drill, Infisical, Gitea webhook cleanup.
- 19/28 checklist items complete.
|
2026-07-07 17:58:29 +02:00 |
|
|
|
dcd35b6315
|
phase 6: deploy pipeline — CI, cutover checklist, watchdog, verification, rollback
- scripts/deploy.sh: Gitea webhook-triggered deploy (git pull → docker build
→ compose up → health check). SHA-tagged images, rolling restart.
- scripts/watchdog.sh: cron health check every 2min, pages operator via
Matrix after 3 consecutive failures. Reset on recovery.
- scripts/verify-phase6.sh: 14 end-to-end verification checks against
plan V1–V14 (ontology, DB, API, scheduler, actuator, learning, classifier,
hermes, secrets, deploy, knowledge, observability, correlation, cutover).
- scripts/rollback.sh: re-deploy previous SHA tag + pg_restore from
pre-deploy dump. Health check loop, returns to main branch after.
- scripts/cutover-checklist.md: pre/post-cutover steps — backup, CI gate,
Caddy re-point, DNS, apps/105 disable, cleanup.
- compose/caddy/Caddyfile.oikos: reverse-proxy config for
oikos/mcp/hermes.hubris.network → mac-mini mesh IP.
- .gitignore: added bin/ to exclude compiled binaries.
14/14 verification checks pass against running Docker stack.
|
2026-07-07 17:37:21 +02:00 |
|