Commit Graph

2 Commits

Author SHA1 Message Date
e074f04bdf feat: Phase 0 of hexagonal refactor — ADR 0016, core scaffold, depguard rules
Problem: the hexagonal-architecture plan (plans/2026-08-15-hexagonal-
architecture.md) needs its foundation — an accepted ADR, the target
directory tree, and machine-checked dependency rules — before any
service extraction starts. Also folds the four outstanding review
findings (F3.1/F5/F6/F7) into the plan: ObservationService owns the
bounded probe-concurrency contract (scheduler.go:133), Phase 9 gates
ExecutionService+PolicyService ≥ 90% with a gating-matrix test,
per-phase abort criteria, and the §3.2 internal/config note.

Change:
- docs/adr/0016-hexagonal-ports-adapters.md records context, decision,
  and consequences of the ports & adapters migration.
- internal/domain → internal/core/domain (mechanical import rewrite,
  20 files), new internal/core/{ports,app}, internal/adapters trees
  with package docs.
- .golangci.yml: depguard rules for §3.1 (core purity, no agent-client
  tech in core, nomos isolation — the nomos rules self-activate when
  internal/nomos exists in Phase 8). Config migrated to golangci-lint
  v2 format so it loads at all (the v1 config errored under v2, masked
  by CI's advisory continue-on-error). Verified depguard fires on a
  planted openai-go import in internal/core/app.
- CONTRIBUTING.md layout section now shows the core/adapters tree.

Risk: import path churn is mechanical and tests pass unchanged; the
lint config migration surfaces the pre-existing 400-issue baseline
(advisory in CI, unchanged policy) — new/moved packages lint clean.

Verification: go vet ./..., make test (race, core/domain at 100%
coverage), make generate-check, golangci-lint on internal/core/... and
internal/adapters/... — 0 issues; depguard violation probe confirmed.
2026-08-15 22:09:19 +02:00
75c0848a6f 0.29.0 — code-quality refactor (plan E1–E5): file splits, sqlc migration, SSH unification, test coverage
Some checks failed
ci / build-test (push) Has been cancelled
ci / docker-build (push) Has been cancelled
ci / web (push) Has been cancelled
Desktop App / Build Linux (amd64) (push) Has been cancelled
Desktop App / Attach to Release (push) Has been cancelled
E1: split monolithic files — cmd/nomos (main.go → server.go + mcp.go + workers.go),
    internal/mcp/tools.go → entity_tools/ops_tools/knowledge_tools/analysis_tools,
    internal/httpapi/impl.go → domain files (entities, events, signals, ontology,
    fleet_health, client_context, client_lifecycle, entity_mutations, query_audit).
E2: migrate raw pool.Exec queries to sqlc (entities/relationships queries + generated).
E3: unify SSH — consolidate crypto/ssh dial into actuator/client.go (+client_test).
E4/E5: add tests — db/lifecycle, checkdefaults/build, ontology/preconditions, policy/risk.
2026-08-08 22:47:06 +02:00