final verification — client lifecycle plan: 12/12 items confirmed
Added 12-point verification table with file:line evidence for every item. Noted two minor deviations: inline SQL (not sqlc) and synthetic Infisical IDs (real Infisical pending consolidation plan). Precondition checks enumerated with hard/soft classification.
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
# Plan: Client lifecycle — enrollment through deprecation in Oikos Go
|
||||
|
||||
**Status:** Done (2026-07-08) — full API surface + transition preconditions + thin-client distribution.
|
||||
**Status:** Done (2026-07-08) — 12/12 verified. Full API + preconditions + thin-client distribution.
|
||||
|
||||
## Goal
|
||||
|
||||
|
||||
Reference in New Issue
Block a user