Initial commit — design docs + Phase 0 validation harness
Sets up the Socrata project repo with: docs/ — strategy and design documents - idea.md: full product vision - implementation-plan.md: Phase 0 + Phase 1 MVP plan - phase-0-validation.md: 2-week validation experiment strategy - phase-0-plan.md: concrete Phase 0 build plan - phase-0-results.md: Phase 0 gate outcome — GO for MVP - sysml-modeling.md: metamodel + SE discipline + validation rules - socrates.md: agent character, surfaces, modes, prompts, lifecycle - sync.md: bidirectional text↔diagram sync engineering - design-source/: HTML/CSS/JS handoff bundle from Claude Design phase-0/ — validated harness (CLI, no UI, no DB) - LM Studio (local OpenAI-compatible) generation + detection + judge - PlantUML rendering for SysML model visualization - 10-seed corpus (8 working + 2 holdouts) - 5 corpus runs with iteration history in reports/ - Final gate: 10/10 pass, mean 4.32/5, holdouts validated Phase 1 MVP scope and milestones documented in implementation-plan.md.
This commit is contained in:
12
phase-0/.env.example
Normal file
12
phase-0/.env.example
Normal file
@@ -0,0 +1,12 @@
|
||||
# LM Studio configuration
|
||||
LMSTUDIO_BASE_URL=http://localhost:1234/v1
|
||||
LMSTUDIO_API_KEY=lm-studio
|
||||
LMSTUDIO_MODEL=google/gemma-4-e4b
|
||||
|
||||
# PlantUML rendering — public server by default
|
||||
PLANTUML_SERVER=https://www.plantuml.com/plantuml
|
||||
|
||||
# Generation defaults
|
||||
PHASE0_TEMP_GENERATE=0.3
|
||||
PHASE0_TEMP_DETECT=0.2
|
||||
PHASE0_TEMP_REVIEW=0.4
|
||||
Reference in New Issue
Block a user